LRH 100.1 Piling rig (LRH series)

Max. pile length | 19.5 m |
---|---|
Max. pile weight | 8 t |
Leader inclination | 1:3 |
Vertical travel device | 4 m |
Basic hammer weight max. | 9,600 kg |
Max. pile length | 19.5 m |
---|---|
Max. pile weight | 8 t |
Leader inclination | 1:3 |
Vertical travel device | 4 m |
Basic hammer weight max. | 9,600 kg |
The compact rig can be transported in one piece with the hammer mounted and is consequently ready for operation on the jobsite in a short time.
The flexible leader kinematics allows very large radii of up to 8 m and inclinations of up to 18° in all directions. Thus, a complete pile group can be installed from one location without repositioning the carrier machine.
Side platform, railings and ladders are fully integrated in the new machine design and no longer need to be removed for transport. more
The Liebherr-own and fuel efficient diesel engine generates the required power. In combination with the on-board hydraulics a sufficient amount of performance for various deep foundation works is provided. When using further attachments like casing oscillators, no additional power pack is needed. more
The crane control system offers a multitude of programme and control options for various piling and drilling methods. Service and machine data is also provided on color displays. The operator thus benefits from a facilitated handling of the rig. Hence, quick working cycles are achieved. more
A global service network with experienced technicians and fast access to spare parts ensure high machine availability and a long product service life. more
Operating weight | 71.3 t |
---|---|
Max. winch line pull | 108 kN |
Max. crowd force | 80 kN |
Drive | Conventional (diesel engine) |
Engine power | 250 kW |
Leader inclination | 1:3 |
Max. height | 24.0 m |
Max. leader lenght | 19.5 m |
Vertical travel device | 4 m |
Max. pile length | 19.5 m |
Max. pile weight | 8 t |
Jib length | 8.7 m |
Basic hammer weight min. | 6,600 kg |
Basic hammer weight max. | 9,600 kg |
Ram mass min. | 3,000 kg |
Ram mass max. | 6,000 kg |
Predrilling, max. drilling depth | 12.0 m |
Predrilling, max. torque | 12 kNm |
Min. transport width | 3,490 mm |
Min. transport height | 3,400 mm |
One single tool for the collection, documentation and analysis of all process, machine, construction site and position data. more
With the PDE process data recording system machine data is recorded during the working process. more
Accurate positioning and precise execution of piling or drilling processes. more
With the eco silent mode the engine speed can be reduced to a predefined, required level. With this feature a notable reduction in diesel consumption can be achieved without any impact on operational output. Noise emissions are thus also lowered.
The machine can optionally be equipped with an automatic engine stop control. Thanks to this feature it automatically switches off during longer work breaks after evaluating several machine parameters. This is fuel saving and environmentally friendly.
The data transmission and positioning system “LiDAT” provides important information on the operation of the machine. With these data the operation becomes more efficient. Various additional modules allow machine data reporting or access through service engineers via teleservice. more
Impact driving uses a hydraulic hammer for the installation of various types of pile. The hammer’s ram mass impacts on the pile. more