LRH 200 Piling and drilling rig (LRH series)
Max. pile length | 24.5 m |
---|---|
Max. pile weight | 16 t |
Leader inclination | 1:3 |
Vertical travel device | 6,5 m |
Basic hammer weight max. | 18,000 kg |
Max. pile length | 24.5 m |
---|---|
Max. pile weight | 16 t |
Leader inclination | 1:3 |
Vertical travel device | 6,5 m |
Basic hammer weight max. | 18,000 kg |
The flexible leader kinematics allows very large radii of up to 8 m and inclinations of up to 18° in all directions. Thus, a complete pile group can be installed from one location without repositioning the carrier machine.
The special leader kinematics allow the leader to be raised or lowered by 6.5 m above/below ground level.
Basic machine and leader can be transported in one piece with all hydraulic hoses connected. The minimized assembly work allows for quick and easy transportation of the machine between jobsites.
Side platform, railings and ladders are fully integrated in the new machine design and no longer need to be removed for transport. more
The innovative cabin design includes a modern air-conditioning system and an optimized view from the cabin, as well as an orthopaedic operator’s seat. All switches, joysticks and pedals are ergonomically positioned.
The Liebherr-own and fuel efficient diesel engine generates the required power. In combination with the on-board hydraulics a sufficient amount of performance for various deep foundation works is provided. When using further attachments like casing oscillators, no additional power pack is needed. more
Innovative crane control
The crane control system offers a multitude of programme and control options for various piling and drilling methods. Service and machine data is also provided on color displays. The operator thus benefits from a facilitated handling of the rig. Hence, quick working cycles are achieved.
moreAttachment recognition
The automatic attachment recognition also records performance figures of the respective attachment.
moreWinch automation
Free-wheeling winches with slack rope monitoring and prevention.
moreCruise Control
Cruise Control is available for automatic piling and drilling processes and allows for values such as pull-down speed and rotational speed to be programmed in advance.
moreDrilling assistant for single-pass process
With double-rotary, full displacement or continuous flight auger drilling, the concreting process is automated.
moreLeader inclination memory
At the touch of a button, the leader can be set to the desired inclination at the piling or drilling point for each new working step.
moreHigh service availability
A global service network with experienced technicians and fast access to spare parts ensure high machine availability and a long product service life.
moreOperating weight | 81.0 t |
---|---|
Max. winch line pull | 200 kN |
Max. crowd force | 200 kN |
Drive | Conventional (diesel engine) |
Engine power | 250 kW |
Leader inclination | 1:3 |
Max. height | 29.2 m |
Max. leader lenght | 25.7 m |
Vertical travel device | 6,5 m |
Max. pile length | 24.5 m |
Max. pile weight | 16 t |
Max. torque | 250 kNm |
Jib length | 7.8 m |
Basic hammer weight min. | 6,740 kg |
Basic hammer weight max. | 18,000 kg |
Ram mass min. | 3,000 kg |
Ram mass max. | 10,000 kg |
Predrilling, max. drilling depth | 17.4 m |
Predrilling, max. torque | 35 kNm |
Continuous flight auger drilling, max. drilling depth | 34.5 m |
Continuous flight auger drilling, max. drilling diameter | 1,000 mm |
Full displacement drilling, max. drilling diameter | 500 mm |
Full displacement drilling, max. drilling depth | 35.2 m |
Soil mixing, max. mixing diameter | 1,500 mm |
Soil mixing, max. effective length | 34.3 m |
Down-the-hole drilling, max. drilling depth | 25.2 m |
Min. transport width | 3,490 mm |
Min. transport height | 3,400 mm |
One single tool for the collection, documentation and analysis of all process, machine, construction site and position data. more
With the PDE process data recording system machine data is recorded during the working process. more
Accurate positioning and precise execution of piling or drilling processes. more
The Ground Pressure Visualization calculates the current ground pressure of the machine in real time and compares it with the specified safety limits of the relevant jobsite. more
The remote control simplifies the loading process for transportation as well as the assembly of the machine. more
With the eco silent mode the engine speed can be reduced to a predefined, required level. With this feature a notable reduction in diesel consumption can be achieved without any impact on operational output. Noise emissions are thus also lowered.
Automatic engine stop
The machine can optionally be equipped with an automatic engine stop control. Thanks to this feature it automatically switches off during longer work breaks after evaluating several machine parameters. This is fuel saving and environmentally friendly.
Fleet management and teleservice
The data transmission and positioning system “LiDAT” provides important information on the operation of the machine. With these data the operation becomes more efficient. Various additional modules allow machine data reporting or access through service engineers via teleservice.
moreThe loosened soil material is continuously conveyed to the surface using a continuous auger, the so-called continuous flight auger. more
Impact driving uses a hydraulic hammer for the installation of various types of pile. The hammer’s ram mass impacts on the pile. more
Full displacement drilling is a modification of continuous flight auger drilling. The drilling tool used is a smooth pipe with an auger-type starter piece. more
For wet mixing a self-hardening suspension is introduced into the ground. more
For down-the-hole drilling a hammer is mounted on the lower end of a drill rod. The hammer is activated by adding compressed air. more