
Haines & Kibblehouse, Inc. dig deep for Philadelphia’s I-95 reconstruction
Pennsylvania-based heavy civil contractor Haines & Kibblehouse, Inc. (H&K, Inc.) is reconstructing more than a mile of Interstate 95 in Philadelphia, PA, drawing on its extensive experience in highway, bridge and infrastructure construction. Multiple bridge structures, unpredictable soil conditions and a tightly constrained jobsite make the work especially demanding. For H&K, selecting the right equipment is essential to tackling each complex variable.

The corridor’s history adds another layer of complexity to the project. Structures in this part of Philadelphia date to the 1700s, historical building records are limited, and portions of the work follow the former alignment of Frankford Creek. Combined with tightly constrained work zones and the need to maintain traffic throughout construction, these conditions make flexibility and efficiency especially important for H&K, Inc.
We’re excited to modernize our fleet with the Liebherr HS 8300.2. This purchase marks one step taken for Ryan Mining to move toward larger excavation capabilities and projects.
Ryan Incorporated Mining was looking for a machine they could depend on for the lifetime of the mine at Star Quarries. When making the decision to expand their fleet Patrick Ryan, president of Ryan Incorporated Mining, highlights that they chose the Liebherr HS 8300.2 dragline due to its uptime and increased fuel efficiency. As one of Liebherr’s largest duty cycle crawler cranes, this machine was designed precisely for the high-volume material excavation needed to increase production at the Star Quarries mine.
Ryan notes, “We’re excited to modernize our fleet with the Liebherr HS 8300.2. This purchase marks one step taken for Ryan Incorporated Mining to move toward larger excavation capabilities and projects.”

Rebuilding above a historic creek
The H&K, Inc. I-95 reconstruction project has a 100-year design life and includes replacing bridge structures and over a mile of northbound roadway, including a bridge over Frankford Creek. Within that work, 0.75 miles of pile-supported roadway will be replaced with roadway on grade supported by a ground improvement scheme. Reconstruction also includes replacing three large sewer lines with box culverts that provide more direct crossings of the I-95 corridor.
The corridor’s history adds uncertainty below ground. Structures in this part of Philadelphia date to the 1700s, and historical building records are limited. The Frankford Creek waterway once followed the route of the current I-95 corridor before the creek was rerouted during interstate construction in the 1960s. Building over that former tidal creek presents geotechnical challenges. With work zones also limited in size, H&K needs right-sized equipment to perform the work safely and productively.
For H&K, Inc., those conditions posed a practical equipment challenge: how to carry out demanding foundation work without crowding the already constrained site with additional machines.
H&K, Inc. is using the Liebherr LRH 200 with an H6 hammer to install foundation piles. According to H&K, Inc. Pennsylvania Department of Transportation requirements call for pre-drilling to a depth of 25 feet. With a pre-drill attachment and the H6 hammer, the rig handles pre-drilling and pile driving without a separate machine, reducing the amount of equipment competing for space on site. The LRH 200’s positioning flexibility is particularly relevant to H&K Inc.’s bridge foundations, which combine vertical piles and piles inclined at 14 degrees within the same footing. Its leader—the structure that guides the pile-driving equipment—can incline up to 18 degrees in all directions, allowing crews to position the equipment for both vertical and battered piles. The compact rig combines those positioning capabilities with piling and drilling functions on the space-constrained jobsite. “Reliability and support from Liebherr are paramount. The LRH 200 is our first fixed leader pile driving machine, so we experienced a typical learning curve. Liebherr supported our operator through a rigorous off-site training process and then onsite with technical staff until he became comfortable. This has resulted in better-than-expected production and a shorter-than-expected learning curve,” said Justin Lukens of H&K, Inc.
Precision piling in tight quarters
H&K, Inc. is using the Liebherr LRH 200 with an H6 hammer to install foundation piles. According to H&K, Inc. Pennsylvania Department of Transportation requirements call for pre-drilling to a depth of 25 feet. With a pre-drill attachment and the H6 hammer, the rig handles pre-drilling and pile driving without a separate machine, reducing the amount of equipment competing for space on site.
The LRH 200’s positioning flexibility is particularly relevant to H&K Inc.’s bridge foundations, which combine vertical piles and piles inclined at 14 degrees within the same footing. Its leader—the structure that guides the pile-driving equipment—can incline up to 18 degrees in all directions, allowing crews to position the equipment for both vertical and battered piles. The compact rig combines those positioning capabilities with piling and drilling functions on the space-constrained jobsite.
“Reliability and support from Liebherr are paramount. The LRH 200 is our first fixed leader pile driving machine, so we experienced a typical learning curve. Liebherr supported our operator through a rigorous off-site training process and then onsite with technical staff until he became comfortable. This has resulted in better-than-expected production and a shorter-than-expected learning curve,” said Justin Lukens of H&K, Inc.

Ryan emphasizes, “When it comes to managing a quarry inventory, excavation is nearly always the primary bottleneck. Having a reliable machine that can keep you digging is one key to being successful.”
The performance of the HS 8300.2 is further increased due to the innovative hybrid drive Pactronic® built into the design. Utilizing surplus energy generated during operation provides additional power during excavation and can contribute to lower operating costs, depending on application and operating conditions. Paired with the reliable and easy-to-service diesel engine specifically designed for the HS series, this machine provides increased hydraulic power and revenue that can support efficient operation and fuel consumption, depending on the application.

One crane, multiple roles
At the Frankford Creek bridge, H&K, Inc. is using the Liebherr LR 1130.1 crawler crane for both foundation work and service lifting. The crane handles sheet piling and pile driving, then serves the structural work by lifting rebar and formwork. That versatility eliminates the need for separate machines for those tasks.
“The LR 1130.1 has the strength and capacity to drive sheets and piles approaching 100 feet from center pin, while still functioning as a service crane for rebar and formwork,” said Lukens.

Beyond the reach and capacity needed for foundation work and the versatility to serve as a service crane, H&K, Inc. also values the LR 1130.1’s ease of breakdown and re-setup. The contractor identifies this as another important feature of the crane’s use on the project as construction progresses across the jobsite.
H&K, Inc, reports that the LR 1130.1 has the strength and capacity to drive sheets and piles at distances approaching 100 feet from the crane’s center pin while also serving as a service crane for rebar and formwork. On this project, that combination allowed the contractor to avoid using separate machines for geotechnical and structural work.
How does H&K use Liebherr equipment on the I-95 project?
- Pre-drilling: The LRH 200 pre-drills to the 25-foot depth required by PennDOT before pile installation.
- Pile driving: Equipped with an H6 hammer, the LRH 200 installs both vertical and battered piles.
- Flexible positioning: The LRH 200 leader can incline up to 18 degrees in all directions, allowing crews to address varying pile angles in tight working areas.
- Foundation work: The LR 1130.1 drives sheets and piles at distances approaching 100 feet from the crane’s center pin.
- Service lifting: The LR 1130.1 also handles rebar and formwork, reducing the need for another machine on the constrained site.
As reconstruction continues, H&K, Inc.’s approach centers on making each Liebherr machine do more within the space available. Using the equipment for multiple tasks limits the need for additional machines on the complex, constrained jobsite. For H&K, Inc. the challenge is not simply having the capacity to do the work, but fitting that capability into a corridor where traffic must keep moving.




