We need your consent This video is provided by Google*. When you load this video, your data, including your IP address, is transmitted to Google, and may be stored and processed by Google, also for its own purposes, outside the EU or the EEA and thus in a third country, in particular in the USA**. We have no influence on further data processing by Google. By clicking on “ACCEPT”, you consent to the data transmission to Google for this video pursuant to Art. 6 para. 1 point a GDPR. If you do not want to consent to each YouTube video individually in the future and want to be able to load them without this blocker, you can also select “Always accept YouTube videos” and thus also consent to the respectively associated data transmissions to Google for all other YouTube videos that you will access on our website in the future. You can withdraw given consents at any time with effect for the future and thus prevent the further transmission of your data by deselecting the respective service under “Miscellaneous services (optional)” in the settings later also accessible via the “Privacy Settings” in the footer of our website). For further information, please refer to Data Protection Declaration and the Google Privacy Policy. * Google Ireland Limited, Gordon House, Barrow Street, Dublin 4, Ireland; parent company: Google LLC, 1600 Amphitheatre Parkway, Mountain View, CA 94043, USA
** Note: The data transfer to the USA associated with the data transmission to Google takes place on the basis of the European Commission’s adequacy decision of 10 July 2023 (EU-U.S. Data Privacy Framework).

Site Monitoring creates transparency on site

When it comes to load handling, tower cranes are among the most important machines on site. For a project to be carried out successfully, relevant machine and process data needs to be available quickly, and in a clear and comprehensive form. This is exactly what Liebherr Site Monitoring, a digital solution for construction contractors, makes possible:

• Capturing of digital machine and process data

• Information for supervisors and construction planners

• Site diary enhancement with digital lifting data

An intuitive interface facilitates the fast display of key information, such as the number of lifts carried out and how optimal these were in terms of their travel path. This provides site managers and supervisors with a basis for their decision-making.

Site planners can use this captured material movement data to check set-ups and related assumptions. The knowledge gained can be used in subsequent construction projects.

The lifting data obtained can also be used to enhance site diaries. Materials moved by the crane can be recorded with further process data for later traceability.

Contact

If you have questions about analyse with Liebherr Tower Cranes or you’re interested in Site Monitoring, please don’t hesitate to contact us via email or give us a call!

Dominik Roser

Product Manager Digital Solutions

Liebherr-Werk Biberach GmbH

Phone: +49 (7351) 413173

Cycle of an intelligent construction site

  • 0
    Wish list
    The product was added to your wish list.
  • 0 Compare list
    Select at least one other product to start the comparison. You can only compare a maximum of 7 products per list. Remove products from the list or reset the list. You can only manage a maximum of 7 different compare lists at the same time. The product was successfully added.
    Start comparison
    Your compare list is empty. You can select products to compare on the product pages.
Your wish list includes:
Recently added: Your wish list does not contain any products.
close