News & press releases

Filter reports

Period

Subject

Hits 2,941-2,950 of 3,243

News | 12/04/2014

First trial - 1000 EC-B 125 Litronic Flat-Top crane erects wind turbine

The new 1000 EC-B 125 Litronic was recently used to erect an Enercon wind turbine in Wardenburg in the Rural District of Oldenburg. Find out more

News | 12/04/2014

Four Liebherr tower cranes building the tallest building in the world in Jeddah, Saudi Arabia

Four Liebherr luffing jib cranes are to be used on the tallest building in the world, three type 280 HC-L 16/28 and one 357 HC-L 18/32 Litronic. Find out more

News | 12/02/2014

First crawler crane for Krandienst Schulz

The company's investment in a Liebherr LR 1600/2 crawler crane marks the first step for Krandienst Schulz into the crawler crane hire market Find out more

Press releases | 12/02/2014

First crawler crane for Krandienst Schulz - Liebherr LR 1600/2 added to crane fleet

Hamburg-based Autokranvermietung Krandienst Schulz has taken another major step in its history – the company's investment in a Liebherr LR 1600/2 crawler crane marks its first step into the crawler crane hire market. Krandienst Schulz decided on the new SL13 boom system which is designed for the erection of the latest generation of wind turbines with hub heights of over 150 metres. Find out more

Press releases | 11/28/2014

Four Liebherr tower cranes building the tallest building in the world in Jeddah, Saudi Arabia

The very first building over 1,000 metres in height – the Kingdom Tower in Jeddah, Saudi Arabia. Liebherr was awarded the order to supply four HC-L series tower cranes for the project. Current plans call for three 280 HC-L luffing jib cranes and one 357 HC-L model to be used. The experts at Liebherr Tower Crane Solutions are providing support to the contractor to ensure economical crane planning. Find out more

News | 11/28/2014

Spectacular lift of an RL-K 7500

Four Liebherr cranes lifting new RL-K 7500 subsea crane onto transportation device. Find out more

News | 11/28/2014

Disability Awareness Week at Liebherr-Aerospace in Toulouse

Liebherr-Aerospace Toulouse SAS participated in the National Disability Awareness Week from November 17 to 23, 2014. Find out more

Press releases | 11/26/2014

Common Rail Systems from Liebherr for Engines with up to Five Liters of Displacement per Cylinder

Liebherr presents its Common Rail system platform 11.5 for the first time to the Asian market at the trade fair Bauma China 2014 in Shanghai from 25 to 28 November. The new platform is suitable for engines with up to five liters of displacement per cylinder. Start of series production will be in 2016. The system complements Liebherr’s Common Rail platform 11.2, which is suitable for engines with up to two liters of displacement per cylinder. Outstanding features are the injector without permanent leakage, the oil-lubricated high pressure pump with a maximum output of 900 liters per hour and the Liebherr engine control unit that is suitable for the toughest of environmental conditions. Find out more

News | 11/26/2014

Bauma China starts with a large number of visitors

Despite rain on the opening Liebherr recorded a large number of professional visitors at the 2014 Bauma China. Find out more

Press releases | 11/25/2014

First trial - Liebherr 1000 EC-B 125 Litronic Flat-Top crane erects wind turbine

The new 1000 EC-B 125 Litronic was recently used to erect an Enercon wind turbine in Wardenburg in the Rural District of Oldenburg. With a lifting capacity of 125 tonnes, this Flat-Top crane is the largest crane in the Liebherr Tower Cranes Division product range. First unveiled at the Bauma 2013, the largest trade fair for construction machinery in the world, the crane attracted a great deal of interest. Find out more

  • Results per page