Search
Search text
Results 691–700 of 982
Manoeuvring in narrow points: LTM with RemoteDrive
Since the feature was introduced for the two LTM cranes, several mobile cranes with RemoteDrive have already been delivered to customers all over the world.
Ultra-precise teamwork - saving lives by helicopter
The latter involves flying patients who are already under medical care from one hospital to another: this may be because they need a particular operation or specialist treatment that is only available
https://www.liebherr.com/en-us/group/magazine/ultra-precise-teamwork/ultra-precise-teamwork-7647617
Whisky Waves
There, ‘Carly’, the landing craft painted bright red, is already waiting to take the LTM 1230-5.1 to the Isle of Jura.
Innovative Rail Solutions: Omaha Track & Liebherr A 924
“Our partnership with Omaha Track has demonstrated that a Liebherr railroad excavator is capable of far more than standard railroad track maintenance.
https://www.liebherr.com/en-us/group/staying-on-track-with-the-liebherr-a-924-rail-machine-7623469
The Construction Site Booster
When a heavy transporter laden with components arrives, the assembly team and João Neves, the crane operator of the LTR 1100, are already waiting.
Low-GWP HVAC solutions for railway | Liebherr-Aerospace & Transportation SAS
Liebherr leads the industry in low-GWP HVAC systems, with air cycle technology already in operation and advanced HVAC solutions using CO₂ or propane refrigerants are in series production.
Compact and strong, transport in one
“I was already familiar with VarioBase® from some of the LTM cranes I have tested.
Cool design
“A field test like this is nothing new for us, as we have already successfully completed it for an engine project.
Looping the loop for Europe
Space at the project site in Rust was also often in short supply – the buildings for the future theme area were already being built at the same time as the growing roller coaster, and in its immediate
Under high voltage
“Since all the supports for the warehouse had already been erected, it was already quite tight when handling the long prefabricated parts,” explains Matthias Bachmann.