Search
Search text
Results 191–200 of 325
Technical data - LR 1130.1 crawler crane
m with A-frames 2 + 3 (No. 1309.22) Weight including pendants kg 4553 Fixed jib 0806.xx 930 Jib section 6 m (No. 0806.15) Weight including pendants kg 249 6025 920 1155 Jib head 5.5 m (No. 0806.16
https://assets-cdn.liebherr.com/versions/8e479b4e-2b9b-4b27-9d82-e4f21768da97/original/
Made with Liebherr
An LTM 1130-5.1 from Ulferts was used for this work.
Problem solver digitalisation
It all started with induction training for an LTM 1650-8.1 – in Japan.
Technical data sheet LHM 600 / LPS 600
Weight rotator 5.5 t Maximum crane capacity 208 t Hook operation on the ropes Outreach Heavy lift Main Dimensions Heavy Lift Operation Lifting Capacities Heavy Lift Operation Project
https://assets-cdn.liebherr.com/versions/b00921fa-abc1-45a5-8e22-c70a8a899c98/original/
LHM 600
ty ( Outreach (m) um 2 14 m on the ropes Lifting capacity 208 t Hook operation on the ropes Outreach Heavy lift Weight rotator 5.5 t Main dimensions
https://assets-cdn.liebherr.com/versions/098aed9b-1e9a-4520-8652-92e7a6f66c71/original/
Made with Liebherr
An LTM 1500-8.1 and an LTM 1250-1, in the service of Bay Crane based in New York, jointly lifted the Concorde from the cargo ship to its final position on the quay wall. 14,400 kilometres, 53 days and
Extraordinary moments about mobile and crawler cranes
Snowtown 2 Wind Farm: An LTM 11200-9.1 erects wind turbines in Barunga Gap in southern Australia. The new LTM 1110-5.1 in its black Bauma livery caused a real stir on the factory site in Ehingen.
Floating one last time
The first of the two LTM 1250-5.1 cranes – which had already been assembled ready for use the day before – kicked off the big gondola relocation at the shipyard.
Singapore – high tech in the glittering metropolis
In total there are currently around 150 mobile cranes, including the LTM 11200-9.1, from Swabia driving around the deep urban canyons of the metropolis.
Construction (hi)stories
Later, a Liebherr LTM 1750-9.1 mobile crane was used to dismantle the last tower crane on the construction site. A demanding job that was only possible from the Elbe due to the position of the crane.
https://www.liebherr.com/en-us/group/magazine/construction-stories/construction-stories-3782103