Mobile and crawler cranes

Search

Search text

Start search

Results 161–170 of 304

Lattice boom mobile cranes

LG lattice boom mobile cranes: Very heavy loads hoisted quickly LG 1750 installes glass roof on cruise ship Worldclass service from the manufacturer Tandem hoist LG 1750 and LTM 11200-9.1 High lifting

https://www.liebherr.com/en-us/mobile-and-crawler-cranes/mobile-cranes/lg-lattice-boom-mobile-cranes/lg_information_1-4407385

Lift-off in Los Angeles

The crawler crane was supported in its painstaking work by two Liebherr mobile cranes: an LTM 1400-7.1 and an LTM 1160-5.2.

https://www.liebherr.com/en-us/mobile-and-crawler-cranes/customer-magazine/all-about-cranes/lift-off-in-los-angeles-7741290

What’s behind the type designation of Liebherr mobile construction cranes?

For mobile cranes, it has been standard practice for at least half a century to state the maximum lifting capacity in the name of the crane – so the LTM 1150-5.3 is a 150-tonne crane.

https://www.liebherr.com/en-us/mobile-and-crawler-cranes/customer-magazine/background/designation-of-mobile-construction-cranes-7707806

Final touchdown

The team was faced with tricky ground conditions when they arrived at the barracks the day before completing the actual crane job using a Liebherr LTM 1450-8.1 mobile crane.

https://www.liebherr.com/en-us/mobile-and-crawler-cranes/customer-magazine/all-about-cranes/final-touchdown-4407661

At the harbour's edge

Crane driver Pedro carefully lifts the rig from the sailing yacht with the LTM 1650-8.1.

https://www.liebherr.com/en-us/group/magazine/at-the-harbour’s-edge/at-the-harbours-edge-3782178

Foggy mission

There were numerous smaller LTM mobile cranes on standby around the construction sites to help with these assembly operations on the overhead line masts.

https://www.liebherr.com/en-us/mobile-and-crawler-cranes/customer-magazine/all-about-cranes/foggy-mission-8551878

Energy revolution 2.0: the green electricity storage facility in Gaildorf

However, crane driver Ralf Karras and his LTM 11200-9.1 mobile crane initially started work on building the active tank on their own.

https://www.liebherr.com/en-us/mobile-and-crawler-cranes/customer-magazine/all-about-cranes/energy-revolution-4407600

Results per page