LRT 1090-2.1
After 28 loyal years of service, an LRT 1090-2.1 replaces its predecessor on Heligoland and brings new range for demanding operations at sea.

LRT 1100-2.1
Between mud and heavy loads: An LRT 1100-2.1 supports the construction of 165 metre high wind turbines.

LRT 1130-2.1
The LRT 1130-2.1 demonstrates its strengths in continuous operation when replacing heavy drive technology in the Garzweiler open-cast mine.