News | 18/03/2016
News | 18/03/2016
The countdown is on for the trade fair start on 11 April: The website set up by Liebherr specially for Bauma 2016 has been online since the start of the year. Since then, new content relating to our appearance at the world's most important building industry trade fair has appeared week after week at www.liebherr-bauma.com.
The visitors can thus get a first picture of the numerous exhibits from the areas of construction machinery, mining and components. Detailed information on over 70 Liebherr products is now available on the website. Until the start of the trade fair, information on further exhibits will be published regularly, supplemented by extensive product specials.
Further information on the Liebherr appearance at Bauma 2016 is provided at www.liebherr-bauma.com, as well as on Facebook at www.facebook.com\liebherrconstruction.

02/10/2026
Press releases
Liebherr is increasing the overall service life of its Fibre ropes from 14 to 16 years, with the decisive period of use rising to up to 12 years. This is based on multi-year ageing trials on test rigs and analyses of ropes already in field. The new ruling applies automatically to all new ropes and those already in the field. This step forms part of Liebherr's ongoing path towards establishing Fibre technology as the new standard in the tower crane market.

01/10/2026
Press releases
Pipe Mikado at the cement works: Liebherr LTM 1650-8.1 moves heavy loads in confined spaces
At the Holcim cement plant in Dotternhausen, a Liebherr LTM 1650-8.1 mobile crane from Wiesbauer GmbH & Co. KG mastered a challenging installation lift: two pipes, each weighing 33 tonnes, had to be hoisted into a new flue gas cleaning plant between existing pipes.

30/09/2026
Press releases
Permit-free from south to north: new Liebherr LTM 1055-3.3 mobile crane for Schlamann-Autokrane GmbH
The LTM 1055-3.3 is the second of four new Liebherr mobile cranes ordered by Schlamann-Autokrane GmbH this year. The new 55-tonne crane is the lightest 3-axle all-terrain crane on the market: it travelled from the Liebherr plant in Ehingen, Upper Swabia, to Nienburg in Lower Saxony without the need for complex authorisation procedures.