Liebherr-Werk Biberach GmbH has managed to win several orders in Australia and New Zealand. During the last few weeks four luffing jib cranes from the HC-L series and a top-slewing crane from the EC-H series have left Liebherr-Werk Biberach GmbH for the voyage down under.
Liebherr's exclusive distributor in Australia, Morrow Equipment Co. L.L.C. based in Caringbah, NSW near Sydney, has expanded its crane fleet. Morrow continues to expand its hire fleet with the purchase of two new 542 HC-L 18/36 Litronic cranes and a used 540 HC-L model.
A 420 EC-H 16 Litronic crane is on its way to Christchurch by sea. The New Zealand government is currently rebuilding the city which was very badly damaged in the serious earthquake which struck in 2011. The rebuilding work reconstruction of the city centre will take several more years to complete, however.
The recently delivered 357 HC-L luffing jib crane is already in use in the construction of a dairy processing plant near Auckland. The 357 HC-L will primarily be used to erect prefabricated concrete components. The Micromove fine positioning mode is particularly useful for this work.

02/10/2026
Comunicati stampa
Liebherr aumenta da 14 a 16 anni la durata complessiva delle proprie funi in fibra, mentre la durata di utilizzo, determinante ai fini dell’impiego, aumenta fino a 12 anni. Alla base di questa decisione vi sono prove di invecchiamento pluriennali condotte su banchi prova e analisi delle funi già in servizio. La nuova disposizione si applica automaticamente a tutte le funi, sia quelle nuove sia quelle già in servizio.

22/09/2026
Listicles
Five questions that show why planning a tower crane deployment is more complex than you might think
On spectacular construction sites, it's the structures that take the spotlight. But building bridges, tunnels or skyscrapers in the first place often demands equally extraordinary crane concepts. From the Sagrada Família in Barcelona to the Fehmarnbelt Tunnel in Denmark, Liebherr supports demanding tower crane deployments worldwide. Max Widder, Head of Project Planning at Tower Crane Solutions, gives insight into the challenges behind some of the most complex crane projects in the world.

10/09/2026
Press releases
Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung
A new residential development is under construction in Ho Chung, Sai Kung. Foundation and excavation and lateral support works have been underway since December 2024 and are expected to continue until end of 2026. Two Liebherr NC-B 12-70 tower cranes are handling material logistics on the confined site.