News | 10/04/2019
VA Erzberg and Liebherr concluded contract for trolley assist system
VA Erzberg and Liebherr have concluded a development contract for a Trolley assist system for Liebherr’s T 236 new 100t mining truck.
News | 10/04/2019
VA Erzberg and Liebherr have concluded a development contract for a Trolley assist system for Liebherr’s T 236 new 100t mining truck.
VA Erzberg intends to electrify the main haul road of its Erzberg mine site and operate a fleet of T 236 trucks from 2021. This electrification project would increase Erzberg life of mine significantly and reduce CO2 emission on site. Liebherr is proud to participate and support this outstanding initiative of VA Erzberg.
Representatives of VA Erzberg and Liebherr celebrated this new collaboration at the Liebherr booth at Bauma.

28/10/2026
Press releases
Liebherr to overhaul KLM Cityhopper’s Embraer 175-E1 landing gears
Liebherr-Aerospace and KLM Cityhopper have signed an agreement covering the overhaul of the main and nose landing gear systems on the airline’s Embraer 175-E1 aircraft fleet. The campaign is scheduled to begin in November 2027.

28/10/2026
Press releases
“In Hamburg, they say ‘Schulz’”: Krandienst Schulz invests in the future with Liebherr
50 years of experience, Hanseatic roots and a firm focus on the future: Krandienst Schulz combines its long-standing tradition with continuous development and the flexibility to respond quickly to new market demands. The family-run company deliberately prioritises investment in staff, digitalisation and a modern vehicle fleet. Even in a challenging market environment, Schulz is sticking to this course and expanding its crane fleet. Six new Liebherr mobile cranes were added in 2026,

27/10/2026
Press releases
Manufacturer’s plant in sight: LTM 1230-5.1 erects concrete columns in Ehingen-Berg
Haslach GmbH, based in Wertach in the Allgäu region, has used its Liebherr LTM 1230-5.1 mobile crane to install three concrete columns, each weighing 20 tonnes, for a potato storage hall in Ehingen-Berg. These columns play a key role in ensuring the stability of the building. Although a smaller crane would generally have been sufficient for the lifts, the family-run company deliberately opted for the 230-tonne crane.