5 questions that reveal why electrifying off-highway machinery is harder than you think

Daniel Bachmann, Managing Director Liebherr Energy Solutions GmbH

What's the question the industry should actually be asking when it comes to electrification?

The job site as an energy system: the Liduro Power Port decouples energy demand from grid capacity – making electrification viable where the grid alone isn't enough.

So what does a job site actually need to make electrification work?

The machine is only part of the answer. This construction site in the Austrian Alps runs on an integrated energy system — proof that the real solution lies in the ecosystem around the machine.

Why is off-highway such a different challenge compared to, say, electric cars?

The right drive for the right application: the L 507 E shows where battery-electric already delivers today.

Is battery-electric always the right answer?

From machine to ecosystem: the Liduro Power Port, paired with Liebherr's Energy Planner software, brings holistic energy management to the job site.

What role does software play in all of this?

Contacts

Katharina Bader
Katharina Bader
Liebherr-International AG General-Guisanstrasse 6 5415 Nussbaumen Switzerland

  • 58 young professionals start their careers at Liebherr in Rostock

    10/09/2026

    News

    58 young professionals start their careers at Liebherr in Rostock

    With the start of the new apprenticeship year, Liebherr-Rostock GmbH welcomes 58 new apprentices across eight different vocational training programs, including construction mechanics, mechatronics technicians, industrial clerks, and warehouse logistics specialists.

  • Offshore Summit 2026 held in Rostock

    10/09/2026

    News

    Offshore Summit 2026 held in Rostock

    The offshore industry faces a wide range of challenges and is undergoing constant change. At the Offshore Summit 2026 in Rostock, Germany, customers, partners and industry representatives came together to discuss current developments and look ahead to the solutions of tomorrow.

  • Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung

    10/09/2026

    Press releases

    Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung

    A new residential development is under construction in Ho Chung, Sai Kung. Foundation and excavation and lateral support works have been underway since December 2024 and are expected to continue until end of 2026. Two Liebherr NC-B 12-70 tower cranes are handling material logistics on the confined site.