
17/01/2018
Notas de prensa
Liebherr presenta su nueva máquina de hinca y perforación LRB 16 para las más diversas exigencias de las obras civiles especiales. Convence gracias a su tamaño compacto y a los diversos sistemas de asistencia que facilitan el trabajo en la obra. La máquina de hinca y perforación también está disponible con prolongación de mástil: LRB 18.

17/01/2018
Press releases
Al Faris places major order for 25 Liebherr mobile cranes
Liebherr has received a major order from Al Faris Equipment Rentals: the company based in Dubai, UAE has ordered 25 new Liebherr mobile cranes to mark its 25th anniversary. The order includes twelve models of the brand new Liebherr LRT 1090-2.1 and LRT 1100-2.1 rough-terrain cranes. The first cranes from the order are due to be delivered late last year.

16/01/2018
Press releases
Liebherr and KAMAZ start production of new diesel engines
Liebherr and KAMAZ celebrate the finalisation and the production start of the mutually developed 6-cylinder in-line diesel engines.

12/01/2018
Press releases
BMS takes delivery of first Liebherr LTM 1090-4.2 mobile crane
Danish crane and heavy haulage contractor BMS took delivery of the very first LTM 1090-4.2 in mid-December 2017. Liebherr first unveiled the 90-tonne crane in March of the same year at the Conexpo in Las Vegas. The new 4-axle crane is extremely flexible since it can travel with axle loads of 10 tonnes, 12 tonnes and 16 tonnes. It features a 60-metre telescopic boom, a whole 10 metres more than its predecessor, the LTM 1090-4.1.

22/12/2017
News
Liebherr-Aerospace Toulouse SAS honored its best suppliers
During its 5th Suppliers’ Day, Liebherr-Aerospace Toulouse SAS presented awards in different categories to the best suppliers in 2017.

21/12/2017
Press releases
Liebherr Aerospace Brasil Ltda. Certified by Nadcap
Liebherr Aerospace Brasil Ltda. has received two certifications by the authority of the Nadcap Management Council for Non-Destructive Testing and Chemical Processing.

20/12/2017
Notas de prensa
Liebherr expondrá multitud de novedades en el estand al aire libre E6/B056 de la Intermat 2018, en el recinto ferial de Villepinte, al norte de París. Además de presentar nuevos productos para el mercado europeo, Liebherr sorprenderá con algunas primicias a nivel mundial. En el pabellón tecnológico, los visitantes también podrán informarse de las soluciones de digitalización más recientes y del programa Reman de Liebherr.

18/12/2017
Press releases
250th Liebherr MK 88 mobile construction crane goes to BKV
Liebherr has supplied the 250th MK 88 to Barneveldse Kraanverhuur (BKV). The Dutch crane contractor is a long-term customer of the construction machine manufacturer and already uses a large number of Liebherr machines for its wide range of work.

18/12/2017
Press releases
Liebherr to Supply Anti-Buckling Systems to Mile City Tramway in China
Liebherr-Transportation Systems was recently selected by CRRC Zhuzhou Electric Locomotive Co., Ltd. (China) to supply anti-buckling systems for nine light railway vehicles to be operated in the city of Mile of Yunnan Province (South of China).

18/12/2017
News
Liebherr-Aerospace Signs Maintenance Services Agreement with Embraer
Liebherr will maintain ERJ135/ERJ145 components and overhaul the nose landing gear of ERJ135/ERJ145 and Legacy 600 aircraft.

18/12/2017
News
OEMServices incl. Liebherr-Aerospace extend A380 component support services with Singapore Airlines
The extended contract reaffirms the satisfaction of Singapore Airlines with the customer service provided for its A380 fleet.

15/12/2017
Press releases
Riga-Mainz completes impressive job with trio of powerful Liebherr cranes
Riga-Mainz produced an impressive performance in a demanding crane and heavy load job involving the installation of a bridge in Essen during November. A steel bridge weighing 418 tonnes and measuring around 50 metres in length had to be positioned over a section of railway track. One of the cranes involved was the new Liebherr LTM 1450-8.1 mobile crane.

14/12/2017
Press releases
Liebherr luffing jib cranes feature on prime new Bangkok ‘Three Neighbourhood’ development
Thai Obayashi is using two Liebherr 160 HC-L cranes and a Liebherr 125 HC-L to construct the Samyan Mitrtown project, near the soon to be opened MRT subway extension.

13/12/2017
Press releases
Christmas tree erected for luxury hotel in St. Moritz
It made a nice change for Swiss construction contractor Hartmann and its Liebherr LTM 1060-3.1 mobile crane. At the end of November, the 60-tonne crane erected a 12-metre Christmas tree in front of the Badrutt’s Palace luxury hotel in St. Moritz. The three tonne fir tree with Christmas decorations creates a festive highlight in the entrance of the 5 star hotel.

13/12/2017
Press releases
Voith and Liebherr sign cooperation agreement for the development, distribution and service of diesel engines for rail vehicles. The cooperation brings Voith’s know-how in the rail industry together with Liebherr’s long-term experience in engine manufacturing.

12/12/2017
Press releases
Liebherr NC-B top-slewing cranes in action
After the launch of the NC-B series last year, the cranes are already working on several construction sites. The smaller one of them is the Balewadi Techpark in Pune, India. The larger one is the NC-B 9-62 that will be exhibit at the booth OD 50 at Excon in India from December 12th to 16th.

11/12/2017
Press releases
First Liebherr LRT rough-terrain cranes delivered
Wasel GmbH Schwerlastlogistik accepted two rough-terrain cranes of the new LRT series from the Liebherr plant in Ehingen at the end of November. With the LRT 1090-2.1 and the LRT 1100-2.1, the company now has the first machines of this new series. The company primarily plans to deploy both rough-terrain cranes in opencast mining as well as on major construction sites with long periods of use.

07/12/2017
Press releases
Liebherr MK 88 Plus mobile construction crane turns night into day
Hoisting bridge elements through two overhead cables was the most difficult part of the job. A Liebherr MK 88 Plus mobile construction crane dismantled a cable bridge at night. The job was completed within a few hours thanks to the lighting concept of Liebherr mobile construction cranes.