Wherever the wind blows...

...Liebherr cranes are not far away! Crane contractor Wiesbauer undertook a job at Rugendorf wind farm (in Bavaria) with a new LR 11000. Four turbines with rotor diameters of 120 metres were erected quickly and successfully with the help of the new V-frame.

First ever LTM 1650-8.1 handed over

The first ever LTM 1650-8.1 left the Liebherr plant in Ehingen during November with a black-and-red livery. It went to Dutch crane and heavy haulage contractor, Mammoet. After all the prototype tests were successfully concluded, deliveries of the crane are now up and running. This crane was unveiled at the Bauma in 2019 with the slogan “The ultimate crane on eight axles” and was handed over in virtual form due to the global coronavirus pandemic.

Tandem power

An LTM 1500-8.1 and an LTM 1750-9.1 unload a 287 tonne hydraulic hammer in Singapore together. It is designed for ramming monopiles, used for the foundations of offshore wind turbines, into the seabed.

  • 0
    Wish list
    The product was added to your wish list.
  • 0 Compare list
    Select at least one other product to start the comparison. You can only compare a maximum of 7 products per list. Remove products from the list or reset the list. You can only manage a maximum of 7 different compare lists at the same time. The product was successfully added.
    Start comparison
    Your compare list is empty. You can select products to compare on the product pages.
Your wish list includes:
Recently added: Your wish list does not contain any products.
close