Search
Search text
Results 581–590 of 1,244
The master of all roads
You may have seen the LTM 1100-5.3 live already – we unveiled it at our Bauma stand in Munich on a 2.55 metre “road”.
Back to the future – the development of the LICCON crane control system
Three of them are already enjoying their well-earned retirement – Erwin Morath established our Control System Department and managed it for decades.
Zero emission, full power
Dr Ulrich Hamme, Technical Director at Liebherr-Werk Ehingen GmbH, says: “We want to be able to offer our customers full crane performance even with the alternative electric power unit.
So close to the sky
LTM 1300-6.3, Franz Ölberger, Ludwig Förderer, Peter Munding A new crane makes its debut and is already the world champion!
No signs of old age
And the team even managed to significantly undercut the required timetable – the last mobile crane was already on its way back towards Hamburg a full eight hours before the road closure was due to end.
Liebherr crane cleans the façade of the Federal Chancellery
Federal Chancellery, Angela Merkel, German Chancellor, façade, Berlin, Hartinger, LTM 1250-5.1 We all know the frustration – you’ve just had the façade of your house freshly rendered and already you can
Swabian power for Heligoland
The LRT 1090-2.1 was then immediately able to demonstrate its off-road capability.
The first ever LTM 1110-5.1 goes to Spain
For example, the new LTM 1110-5.1 has already shown what it can do against an historic backdrop – providing assistance with restoration work on the San Juan el Real Basilica in Oviedo.
The dream of the international crane operators licence
The chamber of industry and commerce in Dortmund has already completed a course. Other crane manufacturers are also coming on board.
A crane job between splendour and megalomania
Centimetre precision was required in the manoeuvring to place the frames over the elements, which were already in position.