Search
Search text
Results 531–540 of 1,002
PHS 1500 | Pallet Handling System | Liebherr
Hetec almost exclusively machines individual parts and small series and adherence to tight delivery deadlines is key.
After Sales Supervisor - Biggleswade
. • Ensuring that unused new parts, warranty parts or service exchange parts are returned, cleaned and labelled to the relevant department from related jobs, and are accompanied by accurate and complete
https://www.liebherr.com/en-us/j/careers/job-vacancies/81315-en-4294646
Service Technician - Crawler and Duty Cycle Cranes
Examine parts for damage or excessive wear using micrometers and gauges. Read, understand, and interpret operating manuals, parts manuals, blueprints and technical drawings.
https://www.liebherr.com/en-us/j/careers/job-vacancies/74736-en-4294646
Field Service Technician - Mobile & Crawler Cranes - Northeast U.S
Examine parts for damage or excessive wear using micrometers and gauges. Read, understand, and interpret operating manuals, parts manuals, blueprints and technical drawings.
https://www.liebherr.com/en-us/j/careers/job-vacancies/79104-en-4294646
New automation test hall with a customer area at Liebherr’s Kempten site
Gripper and load tests for the removal, placement, and fine-positioning of geometrically complex parts are refined to optimize workflows.
Executive - Warehouse & Logistics (BU-Drives)
Replacement of line-rejected parts. Measure cycle time for material feeding.Prepare and maintain Daily Work Reports (DWR).
https://www.liebherr.com/en-us/j/careers/job-vacancies/80384-en-4294646
LICCON crane control system – specially developed for Liebherr mobile cranes
More than 95 % of all spare parts available within 24 hours. This service improves the time that your crane is available and makes your work significantly easier.
Winds of change: Liebherr Components in Brazil
The rotor blade adjustment and nacelle orientation are the moving parts of a wind turbine responsible for the optimisation of wind utilisation.
https://www.liebherr.com/en-us/components/liebherr-manufactures-components-in-brazil-4308410
Liebherr Annual Report 2020: Components
The components were delivered just under a year after production of the parts began. Liebherr also received a sizeable order to provide azimuth thrusters for gondola drives on wind turbines.
Four Liebherr K series cranes support bridge construction project
The heaviest parts, formwork tables with infill zones, weigh between 2.2 and 3.1 tonnes.