Grab drilling

The process of installing a drilled pile using the grab excavation method includes the following steps:

Video drilling with hammer grab

Examples for drilling with pile grab and casing oscillator

Universal drilling process

01/10

Machines

Results 1-5 of 5
  • Max. lifting capacity - 40 t

  • Engine power - 230 kW

  • Max. winch line pull - 2 x 120 kN

  • Max. main boom - 41.00 m

Get in touch