12 minutes reading time

An ode to the wind

Time to turn

How wind is formed

There is (almost) always a wind blowing

Sailing close to the wind

A strong partner in the energy transition

Preparations for a solid fundament

The concrete mixing plants from Liebherr can be joined directly to the production facility for tower sections to ensure the desired highest material quality.

Concrete landmarks

How does wind power work?

Mechanical masterpieces

At Liebherr, the main bearings for wind turbines are tested on a specially developed test rig, where rigidity ratios are realistically simulated.

High-tech in mechanical engineering

Six facts about wind power

Lifting and moving

Larger turbines require larger cranes and new technologies. Here, Liebherr is working with customers to develop high-performance technologies for the erection of wind turbines of the future.
Offshore heavy-duty cranes have load capacities of up to 5,000 tonnes.

This may be of interest to you

Interview

Highlights

The Group magazine