
Press releases | 27/09/2019
Two Liebherr mixing plants Betonmix 3.0 master concrete production at Brenner Base Tunnel
- Considerable amounts of concrete
- Large storage volume with low space requirement
- Individually adapted concrete mix for each rock section
Two Liebherr Betomix 3.0 mixing plants produce concrete for the Brenner Base Tunnel major project. This is one of the most important infrastructure projects for Austria and the European Union.


