
Liebherr-Components Newsletter
Edition 2/2026
Strengthening the present to secure the future
We’ve come a long way since the publication of our previous newsletter. As part of the ongoing advancement in the power generation market, two major events on our Colmar site catch the eye. Strengthening our industrial capabilities here, we aim to support the growing demand for high performance power generation solutions. These go hand-in-hand with the elaboration of our expertise not only in production, but also in product testing. Take our Reman site in Ettlingen, the new testing services available in Biberach or the vast service options for bearings, for example. And this is only the tip of the iceberg. Get down below the surface to grasp all that’s new!
01/02
01/04
01/02













