News | 12/10/2020
News | 12/10/2020
With the start of the new training year 2020/2021, the Liebherr Group welcomes a total of over 400 new apprentices and students at its locations in Germany, Austria and Switzerland. Traditionally, the first days of training are dedicated to getting to know each other. This year, however, this getting to know each other is somewhat different from previous years: Due to the ongoing corona pandemic, the obligatory seminars and training sessions, for example, have been straightened out and divided into different groups, and where possible the events have been moved outside or conducted digitally. Even though this year's start of training was different from usual, the new apprentices and dual students are happy about their start in the working world: "It is really exciting to start working life now and to get so many new impressions every day. You're always learning something new, you can't get bored," reports one of the new apprentices after her first few days at Liebherr.
The Liebherr Group attaches particular importance to the intermeshing of theory and practice during the training, so that the theoretical knowledge gained can be applied directly in everyday work. In general, training has a very high priority within the Liebherr Group, which is convincing in the long term through needs-based planning and already ensures the next generation of skilled workers today.

08/10/2026
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

07/10/2026
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.

06/10/2026
Press releases
A step up: Schweri opts for new Liebherr LTM 1300-6.4 mobile crane
Schweri Autokranbetriebe GmbH & Co. KG is putting an LTM 1300-6.4 into service. With this 300-tonne crane, the company is increasing the lifting capacity of its fleet and responds to increasing demands in wind power, industrial and precast concrete installation projects.