News | 13/05/2015
At the end of February in North Germany the "Anthem of the Seas", the largest cruise ship ever built in Germany was moved out of the massive Hall 2 dock at Papenburger Meyer shipyard. It was only possible to install the funnel casing and "North Star" viewing gondola outdoors due to the sheer size of the vessel. The order for this work was awarded to Gertzen, based in nearby Kluse, which completed the job smoothly using two 750-tonne mobile cranes. Gertzen used the Liebherr LTM 1750-9.1 from its own fleet and an LTM 1750-9.1 hired from Thömen.
Esto también podría interesarle

27/11/2026
Listículos
Liebherr ha vendido su primera grúa de la serie L en Chile. Tres grúas automontables muestran ahora la diversidad de aplicaciones en el país: una 43 K en un astillero de Talcahuano, una 125 K en una refinería de Con-Con y una 33 L en una obra de edificación de altura media en Curauma.

26/11/2026
Press releases
795 km/h: world record powered by Liebherr battery technology
Quantum Systems, a global drone, software and AI company, has set three new speed records for battery-powered flights with its high-speed drone, the Apex Recordhunter. In the one-way record attempt, top speeds of 795 km/h and 777 km/h were achieved, whilst in the two-way record attempt, a speed of 727 km/h over 100 metres was reached. These record-breaking achievements were also made possible due to Liebherr’s high-performance battery.

25/11/2026
News
Political visit to hydrogen-powered wheel loader in Bremerhaven
Members of the German Bundestag Mahmut Özdemir and Uwe Schmidt visited Bremerhaven to learn more about the L 566 H hydrogen-powered wheel loader.

