Mobile crane

  • Up, up and away

    The integral double folding jib delivers a hoist height of up to 144 ft / 44 m.

  • Time-tested engineering

    The 4-piece telescopic boom can be extended quickly using the time-tested hydro-mechanical telescoping system.

  • Lower fuel consumption

    ECOmode reduces fuel consumption by up to 10%.

  • Up to date

    This was the first crane to have data bus technology and today features lots of modifications to keep it state of the art.

  • A great view

    Fast, safe set-up process for the crane using BTT remote control. Optional BTT-E remote control means that the crane can be controlled in a direct line of sight whilst in action.

What's inside

  • Up, up and away:

    The integral double folding jib delivers a hoist height of up to 144 ft / 44 m.

  • Time-tested engineering:

    The 4-piece telescopic boom can be extended quickly using the time-tested hydro-mechanical telescoping system.

  • Lower fuel consumption:

    ECOmode reduces fuel consumption by up to 10%.

  • Up to date:

    This was the first crane to have data bus technology and today features lots of modifications to keep it state of the art.

  • A great view:

    Fast, safe set-up process for the crane using BTT remote control. Optional BTT-E remote control means that the crane can be controlled in a direct line of sight whilst in action.

Photo gallery

MyLiebherr

Our customer portal MyLiebherr is your entrance to the Liebherr service world. It gives you access to extensive basic and additional services for your mobile and crawler cranes

Discover more