An ultra-modern bus terminal is being developed in Moscow

An urban construction project is currently being executed in Moscow: an ultra-modern bus terminal with a capacity of 15,000 passengers per day. The contractor Fensma is relying on Liebherr in two respects during the deep foundation phase.

In the east of Moscow a new bus terminal is being developed on the Sholkovskoye Chaussee. Eleven stories of modern glass design. An attractive selection of shopping and entertainment facilities is elegantly combined with the bus terminal in an architectural complex. Approximately 1,600 bus services are expected daily and at peak times 1,000 passengers per hour.

After a construction period of only two years, the new complex is due to be completed in 2019.

Several duty cycle crawler cranes in operation, equipped with slurry wall grabs.

Several duty cycle crawler cranes in operation, equipped with slurry wall grabs.

Several duty cycle crawler cranes in operation, equipped with slurry wall grabs.
Cast-in-place slurry walls with a total of 310,000 m² and 3,500 t of reinforcement cages are being installed as a lining wall for the foundation pit.

The local contractor Fensma is not only confronted with a time constraint, but also difficult soil conditions: loam, sand, clay and groundwater. Under these conditions it is a particular challenge to achieve the necessary verticality of the slurry wall.

However, Fensma specializes in the realization of urban building projects and is relying on the quality and service of Liebherr construction machinery and customer service during the execution in two respects.

Eight in one go

Deep foundation work for the new building is being carried out by a fleet of eight Liebherr machines including seven duty cycle crawler cranes and one piling and drilling rig type LRB.

  • Cast-in-place slurry walls with a total of 310,000 m² and 3,500 t of reinforcement cages are being installed as a lining wall for the foundation pit.

    Cast-in-place slurry walls with a total of 310,000 m² and 3,500 t of reinforcement cages are being installed as a lining wall for the foundation pit.

  • The slurry wall has a maximum depth of 52 m and is 800 mm thick. Eighteen hours are required for the excavation of one bite with a length of 2,800 mm.

    The slurry wall has a maximum depth of 52 m and is 800 mm thick. Eighteen hours are required for the excavation of one bite with a length of 2,800 mm.

  • The HS 8100 HD is the newest machine in the fleet used by Fensma and convinces with a diesel consumption of only 23 l per hour.

    The HS 8100 HD is the newest machine in the fleet used by Fensma and convinces with a diesel consumption of only 23 l per hour.

  • Video

    We need your consent This video is provided by Google*. When you load this video, your data, including your IP address, is transmitted to Google, and may be stored and processed by Google, also for its own purposes, outside the EU or the EEA and thus in a third country, in particular in the USA**. We have no influence on further data processing by Google. By clicking on “ACCEPT”, you consent to the data transmission to Google for this video pursuant to Art. 6 para. 1 point a GDPR. If you do not want to consent to each YouTube video individually in the future and want to be able to load them without this blocker, you can also select “Always accept YouTube videos” and thus also consent to the respectively associated data transmissions to Google for all other YouTube videos that you will access on our website in the future. You can withdraw given consents at any time with effect for the future and thus prevent the further transmission of your data by deselecting the respective service under “Miscellaneous services (optional)” in the settingslater also accessible via the “Privacy Settings” in the footer of our website). For further information, please refer to Data Protection Declaration and the Google Privacy Policy. * Google Ireland Limited, Gordon House, Barrow Street, Dublin 4, Ireland; parent company: Google LLC, 1600 Amphitheatre Parkway, Mountain View, CA 94043, USA
    ** Note: The data transfer to the USA associated with the data transmission to Google takes place on the basis of the European Commission’s adequacy decision of 10 July 2023 (EU-U.S. Data Privacy Framework).
    Drone shots show the eight Liebherr machines operating in Moscow. Play video We need your consent This video is provided by Google*. When you load this video, your data, including your IP address, is transmitted to Google, and may be stored and processed by Google, also for its own purposes, outside the EU or the EEA and thus in a third country, in particular in the USA**. We have no influence on further data processing by Google. By clicking on “ACCEPT”, you consent to the data transmission to Google for this video pursuant to Art. 6 para. 1 point a GDPR. If you do not want to consent to each YouTube video individually in the future and want to be able to load them without this blocker, you can also select “Always accept YouTube videos” and thus also consent to the respectively associated data transmissions to Google for all other YouTube videos that you will access on our website in the future. You can withdraw given consents at any time with effect for the future and thus prevent the further transmission of your data by deselecting the respective service under “Miscellaneous services (optional)” in the settingslater also accessible via the “Privacy Settings” in the footer of our website). For further information, please refer to Data Protection Declaration and the Google Privacy Policy. * Google Ireland Limited, Gordon House, Barrow Street, Dublin 4, Ireland; parent company: Google LLC, 1600 Amphitheatre Parkway, Mountain View, CA 94043, USA
    ** Note: The data transfer to the USA associated with the data transmission to Google takes place on the basis of the European Commission’s adequacy decision of 10 July 2023 (EU-U.S. Data Privacy Framework).

    Duty cycle crawler cranes at a glance

    The duty cycle crawler cranes are robust and flexible in use and thus perfectly designed for dynamic deep foundation applications.

    Downloads

    Liebherr in Russia

    Liebherr operates two production companies and one sales and service company in Russia with subsidiaries in all of Russia's regions. To Liebherr-Russland OOO

    Sales and Service

    Our customers can rely on a worldwide sales and service network. Search here for the right contact partner. Find your contact person

    Customer service

    Our Customer Service aims to effectively help in maintaining Liebherr equipment at its best. Customer service for crawler cranes

    Video

    Liebherr deep foundation machines in operation around the world. The film shows the different applications. Foundation machines
    Foundation machines
    We need your consent This video is provided by Google*. When you load this video, your data, including your IP address, is transmitted to Google, and may be stored and processed by Google, also for its own purposes, outside the EU or the EEA and thus in a third country, in particular in the USA**. We have no influence on further data processing by Google. By clicking on “ACCEPT”, you consent to the data transmission to Google for this video pursuant to Art. 6 para. 1 point a GDPR. If you do not want to consent to each YouTube video individually in the future and want to be able to load them without this blocker, you can also select “Always accept YouTube videos” and thus also consent to the respectively associated data transmissions to Google for all other YouTube videos that you will access on our website in the future. You can withdraw given consents at any time with effect for the future and thus prevent the further transmission of your data by deselecting the respective service under “Miscellaneous services (optional)” in the settingslater also accessible via the “Privacy Settings” in the footer of our website). For further information, please refer to Data Protection Declaration and the Google Privacy Policy. * Google Ireland Limited, Gordon House, Barrow Street, Dublin 4, Ireland; parent company: Google LLC, 1600 Amphitheatre Parkway, Mountain View, CA 94043, USA
    ** Note: The data transfer to the USA associated with the data transmission to Google takes place on the basis of the European Commission’s adequacy decision of 10 July 2023 (EU-U.S. Data Privacy Framework).

    Foundation methods

    Deep foundation machines from Liebherr can be applied for all common drilling methods, for slurry wall installation and soil improvement. Methods and applications

    Digital solutions

    We offer a number of IT solutions, which provide substantial support for all those involved in the construction site. Digital solutions

    Brochure

    Our new brochure “Solutions for Deep Foundation Work” contains details of machines, tools and applications. Solutions for Deep Foundation Work

    Attachments

    With the attachment devices developed and manufactured in-house, we consolidate our position as a full-service provider in the deep foundation industry. Attachments for piling and drilling rigs