News | 12/17/2014
News | 12/17/2014
Since the last two years the Liebherr plant in Ehingen offers the PowerBoom for its large crawler cranes. The parallel boom which drastically increases load capacities was recently used for the first time on the LR 11000. The latest Liebherr crawler crane in the 1000 tonne class positioned a gigantic machine room on the tower of a wind turbine in Northern Germany. It was a gross load of 220 tonnes.
The heaviest component of the system was the massive machine room. With a radius of 30 metres the LR 11000 together with the load cross beam and hook block hoisted a total load of 220 tonnes to a height of 130 metres. Just for comparison, without the PowerBoom, it would only have been able to hoist around 160 tonnes with the same hook height.
But it is not just the bare figures which are mightily impressive. It was also definitely something to see. The system was fitted to one of the largest wind turbines in the world. The massive star of rotor blades had been completely pre-assembled on the ground. With a diameter of 152 m, the massive propeller was almost the same height as the hight church spire in the world on the Minster in Ulm.

09/15/2026
Press releases
At bauma CONEXPO INDIA 2026, taking place from 15 to 18 September, the Liebherr Group presents engineering excellence through a broad portfolio of machines and technologies. The products at outdoor booth E01 address construction, quarrying, recycling, infrastructure, and industrial applications for the Indian market. Visitors to the 792 m² outdoor booth can explore exhibits from five product segments.

09/08/2026
Press releases
For the construction sites of tomorrow: Hiap Heng enters the mobile construction crane market
On 2. August, the Hiap Heng Group took delivery of its first Liebherr mobile construction crane. With the MK 88-4.1E, the company is expanding its fleet with an efficient lifting solution for construction sites with limited space. The crane combines versatility with high performance and enables fast, low-emission operations on urban construction projects.

09/04/2026
Press releases
Between two six-storey residential blocks in Uppsala (Sweden), a Liebherr mobile construction crane had to move large sections of a canopy from one building to the next.