Grab drilling

The process of installing a drilled pile using the grab excavation method includes the following steps:

Video drilling with hammer grab

Examples for drilling with pile grab and casing oscillator

Universal drilling process

01/10

Machines

Results 1-5 of 5
  • Max. lifting capacity - 40 t

  • Engine power - 230 kW

  • Max. winch line pull - 2 x 120 kN

  • Max. main boom - 41.00 m

  • Max. lifting capacity - 200 t

  • Engine power - 750 kW

  • Max. winch line pull - 2 x 350 kN

  • Max. main boom - 68.00 m

  • Max. lifting capacity - 100 t

  • Engine power - 450 kW

  • Max. winch line pull - 2 x 295 kN

  • Max. main boom - 59.00 m

  • Max. lifting capacity - 70 t

  • Engine power - 320 kW

  • Max. winch line pull - 2 x 200 kN

  • Max. main boom - 50.00 m

  • Max. lifting capacity - 130 t

  • Engine power - 565 kW

  • Max. winch line pull - 2 x 350 kN

  • Max. main boom - 53.00 m

Get in touch