Press releases | 2026-08-04

steinexpo 2026: Liebherr showcases its expertise in machinery and digital innovations for the extraction industry

Contacts

Simon Trümpler
Simon Trümpler
Liebherr-International AG General-Guisanstrasse 6 5415 Nussbaumen Switzerland
+41 79 510 60 22

You might also be interested in

  • Liebherr relies on the MiC 4.0 BUS: more efficiency, safety and transparency when using intelligent attachments

    2026-11-03

    Press releases

    Liebherr relies on the MiC 4.0 BUS: more efficiency, safety and transparency when using intelligent attachments

    Liebherr is integrating the cross-manufacturer communication standard MiC 4.0 BUS into its Generation 8 wheeled excavators, thereby laying the foundations for an even safer, more efficient and more cost-effective use of modern attachments. By integrating the MiC 4.0 BUS, Liebherr is underlining its commitment to offering users forward-looking solutions for safe and productive construction site operations.

  • Liebherr expands electric excavator range with the new 250-tonne-class R 9300 G8-E

    2026-11-02

    Press releases

    Liebherr expands electric excavator range with the new 250-tonne-class R 9300 G8-E

    The R 9300 G8-E is the newest electric excavator in Liebherr’s portfolio and is now available for commercial deployment. It blends Liebherr’s decades of experience with electric excavators with the proven 250-tonne platform, the R 9300 G8. The R 9300 G8-E has an 850 kW electric drivetrain that is available in 6 KV and 6.6 kV configurations as per IEC standards.

  • Film production company Sally Forth Cinema saves 1,314 litres of diesel with Liebherr’s mobile energy storage system

    2026-10-15

    Press releases

    Film production company Sally Forth Cinema saves 1,314 litres of diesel with Liebherr’s mobile energy storage system

    For the filming of a new ARD/WDR series in Germany’s Ruhr region, the production team at Sally Forth Cinema used Liebherr’s Liduro Power Port (LPO 100) mobile energy storage system for the first time. Over a period of 33 filming days, the battery storage system ensured a reliable power supply for the entire base camp. The quiet and locally emission-free energy supply supported the implementation of modern green production concepts and contributed to smooth filming operations.