News | 2014-09-26
Liebherr-Aerospace Toulouse SAS has added a new logistics center to the infrastructure of its site in Toulouse (France). Many guests, including representatives from institutions and industry, attended the inauguration ceremony on September 19, 2014.
The new logistics center, which represents an investment of €11.5 million, houses all functions of the supply chain on 6,300 m² of floor space – incoming goods, incoming goods inspection, stores, outgoing goods inspection and shipping. Also, the building provides office space for purchasing, supplier quality control and other logistics support functions.
Outfitted with the latest technologies, the logistics center is able to process 130,000 components and several hundred thousand spare parts annually, thus meeting the highest requirements of quality, traceability and on-time delivery. Moreover, the building is made of materials that meet the highest standards of thermal performance, and water solar energy is used to heat water.
You might also be interested in

2026-11-05
Press releases
Liebherr-Aerospace strengthens its presence in Australasia
Liebherr-Aerospace is expanding its footprint in Australasia with a new representative office in Sydney, strengthening already existing as well as establishing new local relationships and intensifying customer services across Australia and New Zealand. Based within the Liebherr Group’s existing Pyrmont facility, the office reinforces the company’s commitment to the region, where the aviation industry is currently undergoing a significant period of fleet renewal and investment.

2026-11-05
News
Sustainability Days foster exchange at Liebherr-Aerospace & Transportation SAS
At Liebherr-Aerospace & Transportation SAS in Toulouse, colleagues spent two days exchanging on corporate responsibility, supply chain integration, reporting requirements, and related operational challenges.

2026-10-28
Press releases
Liebherr to overhaul KLM Cityhopper’s Embraer 175-E1 landing gears
Liebherr-Aerospace and KLM Cityhopper have signed an agreement covering the overhaul of the main and nose landing gear systems on the airline’s Embraer 175-E1 aircraft fleet. The campaign is scheduled to begin in November 2027.

