Search
Search text
Results 491–500 of 902
After Sales Supervisor - Biggleswade
. • Ensuring that unused new parts, warranty parts or service exchange parts are returned, cleaned and labelled to the relevant department from related jobs, and are accompanied by accurate and complete
https://www.liebherr.com/en-ca/j/careers/job-vacancies/81315-en-3991094
Service Technician - Crawler and Duty Cycle Cranes
Examine parts for damage or excessive wear using micrometers and gauges. Read, understand, and interpret operating manuals, parts manuals, blueprints and technical drawings.
https://www.liebherr.com/en-ca/j/careers/job-vacancies/74736-en-3991094
Field Service Technician - Mobile & Crawler Cranes - Northeast U.S
Examine parts for damage or excessive wear using micrometers and gauges. Read, understand, and interpret operating manuals, parts manuals, blueprints and technical drawings.
https://www.liebherr.com/en-ca/j/careers/job-vacancies/79104-en-3991094
LICCON crane control system – specially developed for Liebherr mobile cranes
More than 95 % of all spare parts available within 24 hours. This service improves the time that your crane is available and makes your work significantly easier.
Executive - Warehouse & Logistics (BU-Drives)
Replacement of line-rejected parts. Measure cycle time for material feeding.Prepare and maintain Daily Work Reports (DWR).
https://www.liebherr.com/en-ca/j/careers/job-vacancies/80384-en-3991094
Winds of change: Liebherr Components in Brazil
The rotor blade adjustment and nacelle orientation are the moving parts of a wind turbine responsible for the optimisation of wind utilisation.
https://www.liebherr.com/en-ca/components/liebherr-manufactures-components-in-brazil-4001888
Liebherr Annual Report 2020: Components
The components were delivered just under a year after production of the parts began. Liebherr also received a sizeable order to provide azimuth thrusters for gondola drives on wind turbines.
Four Liebherr K series cranes support bridge construction project
The heaviest parts, formwork tables with infill zones, weigh between 2.2 and 3.1 tonnes.
Commercial aircraft | Liebherr-Aerospace & Transportation SAS
This includes additive layer manufactured parts for safety critical applications, or electro-mechanical flight control actuation.
Chuff, chuff, chuff, the railway…
It takes experienced engineers around a week to remove the counterweight plates, folding jib, small parts and sometimes even the wheels.