
06/28/2017
Press releases
Liebherr presents its new piling and drilling rig type LRB 16 suitable for the diverse requirements of deep foundation work. It convinces with its compact design as well as a range of available assistance systems, which ease the work on the jobsite. With a longer leader, the piling and drilling rig is also now available as a LRB 18.

05/30/2017
Press releases
At CTT Moscow 2017, Liebherr displays Construction Machines for the Russian Market
The Liebherr Group is present at CTT Moscow, the international trade fair for construction machinery and technology, from 30 May to 3 June 2017 with a 1,710m² open air exhibition stand (Stand E-1/1).

05/11/2017
News
Liebherr Drilling Rigs Deployed for Plant Expansion at Airbus Defence and Space
Two Liebherr drilling rigs, an LB 28-320 and an LB 36-410, are being used for deep foundation work as part of the Airbus Defence and Space plant extension in Immenstaad am Bodensee, Germany.

05/11/2017
Press releases
Liebherr Drilling Rigs Deployed for Plant Expansion at Airbus Defence and Space
Two Liebherr drilling rigs, an LB 28-320 and an LB 36-410, are being used for deep foundation work as part of the Airbus Defence and Space plant extension in Immenstaad am Bodensee, Germany. The machines are equipped with the rotary drives BAT 320 and BAT 410.

03/07/2017
Press releases
At Conexpo 2017, Liebherr showcases its machine range for the deep foundation industry: the piling rig LRH 600, the hydraulic free-fall hammer H 15 L, the piling and drilling rig LRB 355 and the duty cycle crawler crane HS 8130 HD. These machines have been especially adapted according to US requirements, and are premiering in North America.

02/09/2017
News
A 130-tonne duty cycle crawler crane from Liebherr is currently operating in the midst of an imposing mountain backdrop in the Swiss canton of Ticino.

02/09/2017
Press releases
Spectacular Dredging Application of a New Liebherr Duty Cycle Crawler Crane in the Swiss Alps
A 130-tonne duty cycle crawler crane from Liebherr is currently operating in the midst of an imposing mountain backdrop in the Swiss canton of Ticino. Its task is to free the reservoir’s drain of deposited sediment. For this purpose the machine, which is fitted on a barge, is equipped with a specially designed mechanical clamshell bucket.

02/08/2017
News
Liebherr Machines at the Suez Canal
Ten Liebherr duty cycle crawler cranes and crawler cranes are currently in operation at the Suez Canal as part of a multibillion project.

02/08/2017
Press releases
A total of ten Liebherr duty cycle crawler cranes and crawler cranes are currently in operation at the Suez Canal as part of a multibillion project. A HS 8100 HD duty cycle crawler crane of the newest generation belonging to the German company Züblin is among the machines deployed to assist in the construction of two road tunnels under the Suez Canal near the city of Port Said in North Egypt.

12/22/2016
Press releases
Liebherr’s participation at Conexpo Con/Agg 2017
During Conexpo Con/Agg 2017, Liebherr will present an extensive selection of its Earthmoving, Material Handling and Construction Equipment product range. The Liebherr outdoor booth will be located at the Las Vegas Convention Center, Gold lot G4637.

12/14/2016
News
Liebherr opens new office in Dammam, Saudi Arabia
To further improve its services for customers in Saudi Arabia and neighbouring countries in the Middle East, Liebherr has built a new subsidiary in Dammam, the capital of the "Eastern Province" which was officially opened in November with a large number of customers in attendance.

12/14/2016
Press releases
Liebherr opens new office in Dammam, Saudi Arabia
Fast, good quality service all over the world – this is one of the main factors behind Liebherr's success. To further improve its services for customers in Saudi Arabia and neighbouring countries in the Middle East, Liebherr has built a new subsidiary in Dammam, the capital of the "Eastern Province" which was officially opened in November with a large number of customers in attendance.

08/01/2016
News
Two Liebherr duty cycle crawler cranes proved their efficiency in gravel extraction.

06/17/2016
News
Liebherr piling and drilling rig LRB 355 on Suisse construction site
The Austrian construction company Hilti & Jehle recently used the new LRB 355 piling and drilling rig on a jobsite in St. Gallen.

06/01/2016
Press releases
Liebherr Presents Latest Construction Machinery at the 2016 Ankomak Exhibition
At this year’s Ankomak trade fair held from June 1 to June 5 in Istanbul (Turkey), visitors can find the Liebherr stand in the outdoor area 0 500.

06/01/2016
News
Earthmoving equipment, deep-foundation machines and mobile cranes at the 2016 Ankomak Exhibition
At this year’s Ankomak trade fair held from June 1 to June 5 in Istanbul (Turkey), visitors can find the Liebherr stand in the outdoor area 0 500.

05/31/2016
Press releases
At the CTT Moscow 2016, Liebherr displays Construction Machines for the Russian Market
The Liebherr Group is present at the CTT Moscow, the international trade fair for construction machinery and technology, from 31 May to 4 June 2016 with a 2,700m² open air exhibition stand (Stand E-2).

05/31/2016
Press releases
Liebherr exhibiting 43 metre Truck-mounted Concrete Pump at the CTT 2016
Liebherr shows the modified 43 R4 XXT truck-mounted concrete pump at the CTT 2016. The four-section distributor boom is extremely stable and torsionally rigid, permitting maximum flexibility and a large working range of the distributor boom with narrow outrigging.