News | 28.07.2023
The best moments: Liebherr at Conexpo 2023
Las Vegas, the dazzling metropolis of Nevada, once again hosted North America's largest construction trade fair this year.
News | 28.07.2023
Las Vegas, the dazzling metropolis of Nevada, once again hosted North America's largest construction trade fair this year.
Las Vegas, the dazzling metropolis of Nevada, once again hosted North America's largest construction trade fair this year: from March 14 to 18, 2023, Liebherr presented numerous innovations as well as further developed products and technologies from its extensive range of construction equipment and components at Conexpo. Visitors were able to experience the approximately 30 Liebherr exhibits live on an impressive booth area of 60,400 ft² (5,600 m²).
Powerful machines, innovative technologies and exciting moments: We have reviewed Conexpo 2023 and summarised the greatest highlights and best impressions in a video for you.
Watch the Conexpo highlights.

08.10.2026
Comunicati stampa
Tre gru Flat-Top Liebherr per la trasformazione dei gasometri di Bovisa a Milano
Due gasometri dei primi del Novecento nel quartiere milanese di Bovisa vengono trasformati, secondo un masterplan dell’architetto Renzo Piano, in un nuovo campus dell’innovazione per il Politecnico di Milano. Da marzo 2025, tre gru Flat-Top Liebherr coprono l’intero cantiere e si occupano di tutte le operazioni di sollevamento e movimentazione dei materiali.

08.10.2026
Press releases
THW builds Danube bridge using four Liebherr LTC 1050-3.1 cranes
In Tuttlingen, southern Germany, four small Liebherr cranes have achieved great things: as a temporary replacement for a Danube bridge due for demolition, the LTC 1050-3.1 compact cranes erected a 70-metre-long river crossing as part of a civil defence exercise.

07.10.2026
Press releases
Replacing the European Parliament’s air-conditioning system in Luxembourg required a long reach, precise planning and meticulously coordinated logistics. A Liebherr LTM 1650-8.1 mobile crane from STEIL Kranarbeiten in Trier lifted six old components from the roof and installed the new units.