Composants

Listicles | 13/05/2026

Five ways Liebherr is shaping the future

We invested €708 million in R&D activities in 2025, driving innovation across machines, components and technologies.

1. Research and development

Through assistance systems, such as the Positioning Pilot, crane performance reaches new levels of efficiency and automation.

2. Assistance systems

Liebherr is pioneering alternative drive technologies with the first hydrogen wheel loader - powered by LiGO Injection Systems.

3. Alternative drive technologies

Liebherr‘s Reman programme gives engines and transmissions a second life while saving raw materials and CO₂.

4. Reman programme

With 3,186 interns and apprentices worldwide, Liebherr is developing the skilled workforce of tomorrow.

5. Promoting young talent

Contacts

Anja Schenk
Anja Schenk
Liebherr-International AG General-Guisanstrasse 6 5415 Nussbaumen Switzerland

  • 58 young professionals start their careers at Liebherr in Rostock

    10/09/2026

    News

    58 young professionals start their careers at Liebherr in Rostock

    With the start of the new apprenticeship year, Liebherr-Rostock GmbH welcomes 58 new apprentices across eight different vocational training programs, including construction mechanics, mechatronics technicians, industrial clerks, and warehouse logistics specialists.

  • Offshore Summit 2026 held in Rostock

    10/09/2026

    News

    Offshore Summit 2026 held in Rostock

    The offshore industry faces a wide range of challenges and is undergoing constant change. At the Offshore Summit 2026 in Rostock, Germany, customers, partners and industry representatives came together to discuss current developments and look ahead to the solutions of tomorrow.

  • Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung

    10/09/2026

    Press releases

    Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung

    A new residential development is under construction in Ho Chung, Sai Kung. Foundation and excavation and lateral support works have been underway since December 2024 and are expected to continue until end of 2026. Two Liebherr NC-B 12-70 tower cranes are handling material logistics on the confined site.