Please choose your range
Close

NEW HOSPITAL BUILDING

Job report – the positioning system LIPOS supports continuous flight auger drilling

More than 1000 piles

The available land required substantial foundation work before it was able to support a whole hospital. In an area of 23,000 m², 1,310 piles had to be installed. All piles have a diameter of 630 mm and are being installed using the CFA (continuous flight auger) method. The maximum depth of the foundation piles was 16 m..

A LB 28 drilling rig was used, which was equipped with the LIPOS positioning system for the first time.

Read full job report (PDF, 1.4 MB)

    
        

Fast approach to the drilling points

The LIPOS positioning system played a decisive role in simplifying the work steps: without this system the drilling points would have to be newly measured, drawn and marked at least three times a day.

Table is scrollable
COMPARISON with LIPOS without LIPOS
Drilling plan for the driver digital in paper form
Manoeuvring to the next drilling point GNSS-guided on sight
Ground markings for orientation not necessary peg irons, colour markings, sectional framework
Re-measure drilling points not necessary min. 3 x daily
        
    

Contact us

If you have any further questions about our LIPOS, please contact our support team.

  • 0
    Wish list
    The product was added to your wish list.
  • 0 Compare list
    Select at least one other product to start the comparison. You can only compare a maximum of 7 products per list. Remove products from the list or reset the list. You can only manage a maximum of 7 different compare lists at the same time. The product was successfully added.
    Start comparison
    Your compare list is empty. You can select products to compare on the product pages.
Your wish list includes:
Recently added: Your wish list does not contain any products.
close