At the end of February in North Germany the "Anthem of the Seas", the largest cruise ship ever built in Germany was moved out of the massive Hall 2 dock at Papenburger Meyer shipyard. It was only possible to install the funnel casing and "North Star" viewing gondola outdoors due to the sheer size of the vessel. The order for this work was awarded to Gertzen, based in nearby Kluse, which completed the job smoothly using two 750-tonne mobile cranes. Gertzen used the Liebherr LTM 1750-9.1 from its own fleet and an LTM 1750-9.1 hired from Thömen.
You might also be interested in

10/23/2026
Press releases
Liebherr supplies electromechanical rudder actuator for Phenom 300EV – a milestone in civil aviation
Liebherr-Aerospace has signed an agreement with Embraer to become part of the rudder-by-wire upgrade of the flight control system for the Phenom 300EV. The upgrade includes an electromechanical rudder actuator with integrated control and power electronics. It is one of the world’s first primary flight control applications of an electromechanical actuator (EMA) for a rudder on a civil aircraft. Furthermore, it is the first rudder EMA with fully integrated electronics.

10/21/2026
Press releases
Liebherr electrifies hydraulic construction project with unplugged crawler crane
For the refurbishment of the Brouwer sluice lock complex on the Brouwersdam in the Netherlands, the company De Klerk Werkendam is relying on Liebherr’s battery-powered LR 1130.1 unplugged crawler crane. As part of this, the 50-year-old sheet pile structures are being replaced; these play a key role in regulating the flow of water between the North Sea and the Grevelingenmeer.
.jpg)
10/21/2026
News
Where no two days are the same
Kamuran Yüce hardly ever has a typical working day. As Lead Buyer at Liebherr in Nenzing, she juggles technology, strategy and negotiations on a daily basis. Precisely this variety makes her job so exciting.

