Listicles | 03/28/2025

9 must-see giants at Liebherr’s booth at Bauma

LG 1800-1.0 lattice boom crane

520 EC-B 20 Fibre top-slewing crane

T 264 Battery Electric mining truck

R 9400 E mining excavator

Mobilmix 4.0 mixing plant

LH 60 M High Rise Port E material handling machine

LR 1400.1 SX crawler crane

PR 776 eighth generation crawler dozer

R 998 SME Litronic

Contacts

Anja Schenk
Anja Schenk
Liebherr-International AG General-Guisanstrasse 6 5415 Nussbaumen Switzerland
+41 79 530 43 71

You might also be interested in

  • Manufacturer’s plant in sight: LTM 1230-5.1 erects concrete columns in Ehingen-Berg

    10/27/2026

    Press releases

    Manufacturer’s plant in sight: LTM 1230-5.1 erects concrete columns in Ehingen-Berg

    Haslach GmbH, based in Wertach in the Allgäu region, has used its Liebherr LTM 1230-5.1 mobile crane to install three concrete columns, each weighing 20 tonnes, for a potato storage hall in Ehingen-Berg. These columns play a key role in ensuring the stability of the building. Although a smaller crane would generally have been sufficient for the lifts, the family-run company deliberately opted for the 230-tonne crane.

  • Concord Cranes takes delivery of Africa’s first Liebherr LTM 1400-6.1

    10/27/2026

    Press releases

    Concord Cranes takes delivery of Africa’s first Liebherr LTM 1400-6.1

    Concord Cranes has marked a major milestone for the African lifting industry by taking delivery of the continent’s first Liebherr LTM 1400-6.1 – a new 450-tonne, six-axle mobile crane combining exceptional lifting capacity with all-terrain mobility.

  • Liebherr electrifies hydraulic construction project with unplugged crawler crane

    10/21/2026

    Press releases

    Liebherr electrifies hydraulic construction project with unplugged crawler crane

    For the refurbishment of the Brouwer sluice lock complex on the Brouwersdam in the Netherlands, the company De Klerk Werkendam is relying on Liebherr’s battery-powered LR 1130.1 unplugged crawler crane. As part of this, the 50-year-old sheet pile structures are being replaced; these play a key role in regulating the flow of water between the North Sea and the Grevelingenmeer.