News | 03/18/2016
The countdown is on for the trade fair start on 11 April: The website set up by Liebherr specially for Bauma 2016 has been online since the start of the year. Since then, new content relating to our appearance at the world's most important building industry trade fair has appeared week after week at www.liebherr-bauma.com.
The visitors can thus get a first picture of the numerous exhibits from the areas of construction machinery, mining and components. Detailed information on over 70 Liebherr products is now available on the website. Until the start of the trade fair, information on further exhibits will be published regularly, supplemented by extensive product specials.
Further information on the Liebherr appearance at Bauma 2016 is provided at www.liebherr-bauma.com, as well as on Facebook at www.facebook.com\liebherrconstruction.
You might also be interested in

10/27/2026
Press releases
Manufacturer’s plant in sight: LTM 1230-5.1 erects concrete columns in Ehingen-Berg
Haslach GmbH, based in Wertach in the Allgäu region, has used its Liebherr LTM 1230-5.1 mobile crane to install three concrete columns, each weighing 20 tonnes, for a potato storage hall in Ehingen-Berg. These columns play a key role in ensuring the stability of the building. Although a smaller crane would generally have been sufficient for the lifts, the family-run company deliberately opted for the 230-tonne crane.

10/27/2026
Press releases
Concord Cranes takes delivery of Africa’s first Liebherr LTM 1400-6.1
Concord Cranes has marked a major milestone for the African lifting industry by taking delivery of the continent’s first Liebherr LTM 1400-6.1 – a new 450-tonne, six-axle mobile crane combining exceptional lifting capacity with all-terrain mobility.

10/21/2026
Press releases
Liebherr electrifies hydraulic construction project with unplugged crawler crane
For the refurbishment of the Brouwer sluice lock complex on the Brouwersdam in the Netherlands, the company De Klerk Werkendam is relying on Liebherr’s battery-powered LR 1130.1 unplugged crawler crane. As part of this, the 50-year-old sheet pile structures are being replaced; these play a key role in regulating the flow of water between the North Sea and the Grevelingenmeer.

