News | 04/12/2016
On the special Liebherr-website for the 2016 Bauma www.liebherr-bauma.com the Liebherr Group provides a daily account from ongoing exhibition events. In addition to the news section, a video magazine provides highlights under the entry "show experience". A new edition of the video magazine is issued every day of the fair day at about 8 pm (CET).
After all, stories from and around the Liebherr Bauma booth are abundant: For example, on those who helped to build the 14,000 square meter booth. Or about those Liebherr's employees, who work with dedication for a successful presentation. And of course, the more than 100 construction equipment, mining equipment and component innovations that Liebherr presets at the 2016 Bauma. A wide range of other issues also contributes to make the Liebherr presentation at the Bauma a special show experience.
You might also be interested in

10/27/2026
Press releases
Manufacturer’s plant in sight: LTM 1230-5.1 erects concrete columns in Ehingen-Berg
Haslach GmbH, based in Wertach in the Allgäu region, has used its Liebherr LTM 1230-5.1 mobile crane to install three concrete columns, each weighing 20 tonnes, for a potato storage hall in Ehingen-Berg. These columns play a key role in ensuring the stability of the building. Although a smaller crane would generally have been sufficient for the lifts, the family-run company deliberately opted for the 230-tonne crane.

10/27/2026
Press releases
Concord Cranes takes delivery of Africa’s first Liebherr LTM 1400-6.1
Concord Cranes has marked a major milestone for the African lifting industry by taking delivery of the continent’s first Liebherr LTM 1400-6.1 – a new 450-tonne, six-axle mobile crane combining exceptional lifting capacity with all-terrain mobility.

10/21/2026
Press releases
Liebherr electrifies hydraulic construction project with unplugged crawler crane
For the refurbishment of the Brouwer sluice lock complex on the Brouwersdam in the Netherlands, the company De Klerk Werkendam is relying on Liebherr’s battery-powered LR 1130.1 unplugged crawler crane. As part of this, the 50-year-old sheet pile structures are being replaced; these play a key role in regulating the flow of water between the North Sea and the Grevelingenmeer.

