
Press releases | 24/07/2018
Group of Liebherr cranes hoists roof construction
- Salgert impresses with hoist using six Liebherr mobile cranes
- Steel structure measuring 500 square metres and weighing around 150 tonnes
- Perfectly planned crane job completed in just four hours
The roof construction for a future industrial building near Mechernich had to be hoisted to allow its support pillars to be extended. The job in the town in the Eifel Mountains was tackled by mobile crane and heavy haulage contractor Salgert based in Lohmar using six Liebherr mobile cranes. The steel structure measuring around 500 square metres and consisting of trusses and girders had to be hoisted in full.


