Utility poles can be installed efficiently and safely in track construction using the GMP 25 parallel grab. Add-on components for utility lines can be pre-assembled directly on the lying pole before it is conveniently placed into the foundation with the grab, eliminating the need for personnel in the hazard zone or additional machinery. With the Solidlink 33-9 quick coupling system, all three hydraulic circuits can be connected fully automatically. Customised jaws for specific applications are also available on request, optimising processes, boosting productivity, and reducing costs.
Excavator class - 18 - 24 t
18 - 24 t
Availability -





