News | 04/12/2019
SPD parliamentary group visits Liebherr at Bauma
On 12 April 2019, the SPD parliamentary group visited Liebherr at Bauma in Munich and spoke to family shareholders Patricia Rüf and Stéfanie Wohlfahrt.
News | 04/12/2019
On 12 April 2019, the SPD parliamentary group visited Liebherr at Bauma in Munich and spoke to family shareholders Patricia Rüf and Stéfanie Wohlfahrt.
SPD Bavaria focuses on the following in the energy policy: Energy efficiency and the reduction of CO2 emissions. In precisely these areas Liebherr has something to show at this year’s Bauma: from the electrically driven truck mixer to the e-mining excavator, the new green technologies impressed the SPD parliamentary group. The party explored the subject of alternative drives and the future construction site in depth with the two family shareholders Patricia Rüf and Stéfanie Wohlfahrt. The Liebherr Group is working on the idea of an emissions-free construction site with different drive concepts. The SPD parliamentary group ended their visit with a guided tour of the trade fair stand and the presentation of individual exhibits such as the fully electric LH 110 C port material handler.
The Liebherr Group has a total of 5 sites in Bavaria and is therefore a relevant player in the Bavarian economic and energy policies.

10/15/2026
Press releases
Liebherr overcomes access restrictions to lift a Derrick crane onto a Paris high-rise roof
A Liebherr Derrick crane has been transported piece by piece onto the roof of the Opus 12 tower in Paris La Défense, using a goods lift and a helicopter. Because the heaviest and largest components could not reach the site and the roof could not bear the load of a standard crane, Liebherr Tower Crane Solutions, Liebherr France (LDF) and the client Legendre developed this rooftop lifting solution together.

10/15/2026
Press releases
For the filming of a new ARD/WDR series in Germany’s Ruhr region, the production team at Sally Forth Cinema used Liebherr’s Liduro Power Port (LPO 100) mobile energy storage system for the first time. Over a period of 33 filming days, the battery storage system ensured a reliable power supply for the entire base camp. The quiet and locally emission-free energy supply supported the implementation of modern green production concepts and contributed to smooth filming operations.

10/13/2026
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.