On occasion of the international trade press conference " Pré-Intermat " on 22 January 2015 in Paris Liebherr was the only manufacturer who was awarded with two trophies of the Intermat Innovation Award. The Gold Award in the category "Equipment & Components" went to the newly developed crane operator elevator system "LIUP" , a silver trophy in the “Engineering & Systems” category was awarded to the new Liebherr Demolition Control System ( LDC) for demolition excavators.
Existing crane operator elevator systems are equipped outside the tower section, and thus require during each dismounting of the crane to dismantle. With Liebherr innovative LiUP-System, the lift is pre-installed permanently inside the tower. Only an adjustment between each tower section is required. Thus operation costs are reduced significantly. A further innovative feature is the reduction of the energy consumption by using a battery which will is charged through the downhill rides of the elevator.
Liebherr’s new developed unique LDC-system for demolition control provide the operator of Liebherr demolition excavators at any time the accurate position of the demolition attachment in order to guarantee the stability of the demolition excavator. This system allows extended reach within safe operation mode. The challenge was to find a solution to integrate this LDC system into the electronics of the excavator and to simplify the manipulations for the operator. This was resolved by developing an automatic recognition of the attachment lengths and by installing angle sensors.

10/13/2026
Listicles
7 projects that show how varied Tower Crane Solutions projects are around the globe
From the basilica in Barcelona to the airport in Santiago de Chile. The Liebherr Tower Crane Solutions (TCS) department has been involved in some of the world’s most demanding construction projects in recent years. Seven examples show how varied these projects can be around the globe. What all the projects have in common is that they call for individual crane concepts and close collaboration with customers.

10/08/2026
Press releases
Three Liebherr flat-top cranes support the transformation of Milan's Bovisa gasometers
Two early twentieth century gasometers in the Bovisa district of Milan are being redeveloped into a new innovation campus for Politecnico di Milano, based on a master plan by architect Renzo Piano. Since March 2025, three Liebherr flat-top cranes have covered the entire construction site, handling lifting and material handling work across the project.

10/02/2026
Listicles
More experience, more confidence: six questions on the new period of use for Liebherr fibre ropes
Liebherr is increasing the period of use of its fibre ropes to up to 12 years in temperate climates and up to 8 years in hot climates, while the overall service life is rising from 14 to 16 years. But what's behind this decision, and why do all ropes already in the field benefit too? Six questions for Jochen Huber, Product Manager Fibre Technology at Liebherr, on the tests, the impact for customers on site, and the wider strategy behind Fibre technology.