With the re-launch of the microsite, which was first offered for the 2011 Conexpo, Liebherr informs on the activities of the Liebherr Group at the 2014 Conexpo. As of January 15, www.liebherr-conexpo.com provides a wide range of information about the trade show of the construction industry, which will take place from March 4 to 8 in Las Vegas, USA.
In depth information on the more than 20 Liebherr exhibits from the fields of earthmoving, material handling, tower cranes as well as mobile and crawler cranes, concrete technology, deep foundation and components can be found at the microsite. Useful information for visitors to the Liebherr booth in the outdoor area Gold Lot, stand 2155 are also part of the site.
Reports as well as images and videos will supply visitors with information, impressions and useful advice on the Liebherr Conexpo presentation. Various brochures are available for download.

10/13/2026
Press releases
Boosting performance for wind power expansion: Gertzen retrofits the LR 1800-1.0 with the X3 system
Gertzen Kranlogistik GmbH & Co. KG has retrofitted its Liebherr LR 1800-1.0 crawler crane with the X3 boom system. With this upgrade, the company is significantly expanding its range of services in the wind energy sector.

10/13/2026
Listicles
7 projects that show how varied Tower Crane Solutions projects are around the globe
From the basilica in Barcelona to the airport in Santiago de Chile. The Liebherr Tower Crane Solutions (TCS) department has been involved in some of the world’s most demanding construction projects in recent years. Seven examples show how varied these projects can be around the globe. What all the projects have in common is that they call for individual crane concepts and close collaboration with customers.

10/08/2026
Press releases
Three Liebherr flat-top cranes support the transformation of Milan's Bovisa gasometers
Two early twentieth century gasometers in the Bovisa district of Milan are being redeveloped into a new innovation campus for Politecnico di Milano, based on a master plan by architect Renzo Piano. Since March 2025, three Liebherr flat-top cranes have covered the entire construction site, handling lifting and material handling work across the project.