Five questions that show why planning a tower crane deployment is more complex than you might think

Max Widder, Head of Project Planning, Tower Crane Solutions bei Liebherr.

1. Why isn't the strongest available crane simply enough for a record-breaking structure?

The Fehmarnbelt Tunnel between Denmark and Germany: at around 18 kilometres, the longest immersed tunnel in the world. More than 20 Liebherr tower cranes are in operation here, many of them rail-mounted.

2. Over 50 cranes at Istanbul Airport, a two tower cranes at the Sagrada Família: which projects present Tower Crane Solutions with the greater challenge?

Sagrada Família in Barcelona: a Liebherr 710 HC-L 32-64 Litronic with a load capacity of 64 tonnes is supporting the completion of the Tower of Jesus Christ, which has now reached its final height of 172 metres.

3. Liebherr cranes supported the completion of the Sagrada Família’s Tower of Jesus Christ, one of the most famous buildings in the world. What makes this project so special for you personally?

The Çanakkale Bridge in Türkiye: with a span of 2,023 metres, the longest suspension bridge in the world. Two Liebherr 357 HC-L 12/24 Litronic luffing jib cranes were used on the pylons, each erected at a height of 318 metres.

4. How does crane planning actually come together, and how does TCS provide support throughout the entire project?

Filstal Bridge on the Wendlingen–Ulm high-speed line: four cranes from the EC-H series, including a 630 EC-H 40 Litronic, were deployed on the roughly 500-metre-long, 85-metre-high bridge.

5. What sets Tower Crane Solutions apart from a classic external planning consultancy?

Video

Contacts

Shannon Korff, Marketing Specialist
Shannon Korff
Marketing Specialist
Liebherr-Werk Biberach GmbH Memminger Straße 120 88400 Biberach an der Riß Germany

You might also be interested in

  • 7 projects that show how varied Tower Crane Solutions projects are around the globe

    10/13/2026

    Listicles

    7 projects that show how varied Tower Crane Solutions projects are around the globe

    From the basilica in Barcelona to the airport in Santiago de Chile. The Liebherr Tower Crane Solutions (TCS) department has been involved in some of the world’s most demanding construction projects in recent years. Seven examples show how varied these projects can be around the globe. What all the projects have in common is that they call for individual crane concepts and close collaboration with customers.

  • Three Liebherr flat-top cranes support the transformation of Milan's Bovisa gasometers

    10/08/2026

    Press releases

    Three Liebherr flat-top cranes support the transformation of Milan's Bovisa gasometers

    Two early twentieth century gasometers in the Bovisa district of Milan are being redeveloped into a new innovation campus for Politecnico di Milano, based on a master plan by architect Renzo Piano. Since March 2025, three Liebherr flat-top cranes have covered the entire construction site, handling lifting and material handling work across the project.

  • More experience, more confidence: six questions on the new period of use for Liebherr fibre ropes

    10/02/2026

    Listicles

    More experience, more confidence: six questions on the new period of use for Liebherr fibre ropes

    Liebherr is increasing the period of use of its fibre ropes to up to 12 years in temperate climates and up to 8 years in hot climates, while the overall service life is rising from 14 to 16 years. But what's behind this decision, and why do all ropes already in the field benefit too? Six questions for Jochen Huber, Product Manager Fibre Technology at Liebherr, on the tests, the impact for customers on site, and the wider strategy behind Fibre technology.