News | 09/23/2015
According to the findings of the Liebherr crane experts sent to Saudi Arabia the LR 11350 was erected at the time of the accident with a boom length of approximately 190m, parked outside of the Grand Mosque and put out of operation. Previously it had sporadically been used for assembly works. In the late afternoon of 11 September 2015, during a strong thunderstorm and sandstorm with measured wind speeds of 80km/h (according to the CNN Weather Service) and 105km/h (wind recording of a Liebherr Tower Crane near the place of accident), heavy rain falls and a sudden drop in temperature by 20⁰C, the crawler crane was caught by the wind and tilted over the last support rollers of its crawler tracks.
The operating instructions of the LR 11350 and the associated "Wind Speed Charts" show that the crawler crane could not withstand such a high wind load and that the boom should have been lowered to the ground preventatively to avoid the tilting of the crawler crane.
In the meantime Liebherr has taken this very tragic accident in Mecca as reason to point out again to the operators of comparable Liebherr cranes worldwide the influences that wind has on cranes and to the unconditional compliance with the appropriate regulations mentioned in the operating instructions.
You might also be interested in

11/17/2026
Press releases
ESBTP relies on the versatility and robustness of Liebherr machines
Family-run company ESBTP, based in south-west France, operates in a wide range of sectors, from the extraction and processing of construction materials to earthmoving and infrastructure works. A Liebherr customer for around twelve years, the company now operates nine machines from the construction equipment manufacturer, including a particularly versatile L 586 XPower wheel loader.

11/17/2026
News
Liebherr’s slewing bearings and drive technology: face to face with the markets of the future
From dynamic growth markets in the construction industry, through the maritime transformation up to wind energy: This year’s trade fairs highlighted diverse opportunities and challenges in the core markets of the two business units of the Liebherr’s components product segment – slewing bearings and drive technology. The following trade fair reviews illustrate the issues that are currently shaping the industries.

11/13/2026
Press releases
Three Liebherr cranes support heritage-compliant renovation of the Dutch government quarter
Three Liebherr 340 EC-B 12 flat-top cranes are supporting the renovation of the historic Binnenhof in The Hague. The construction company J.P. van Eesteren has been using the brand-new cranes for material transport and assembly work at the parliament and ministry buildings. Jib lengths of up to 75 metres and a compact design make it possible to work in the confined space of the listed building ensemble.