James Cook University’s Daintree Rainforest Observatory at Cape Tribulation recently celebrated the 20th birthday of the Liebherr 91EC Tower Crane which plays a fundamental role in facilitating the university’s research. The 47m high crane is used to carry researchers from the forest floor to above the canopy to undertake ecology and biodiversity studies.
On top of its 20th anniversary, this crane has now been crowned the longest standing crane in Australia. The crane has seen great change in its 20 years, being hit but unfazed by a Category 3 Cyclone early on, and in more recent years has been equipped with automated sensors and wireless data network.
Being one of the team that was involved in putting up the crane 20 years ago, Liebherr-Australia General Manager Mobile Crane Division Andrew Esquilant, and Craig Jones and Jeff Cook from Morrow Equipment, recently attended an anniversary event.
Liebherr-Australia are proud of the unique and interesting application of this crane, and hope it continues to be an excellent resource for Australian and International research into the future.

10/02/2026
Press releases
Liebherr is increasing the overall service life of its Fibre ropes from 14 to 16 years, with the decisive period of use rising to up to 12 years. This is based on multi-year ageing trials on test rigs and analyses of ropes already in field. The new ruling applies automatically to all new ropes and those already in the field. This step forms part of Liebherr's ongoing path towards establishing Fibre technology as the new standard in the tower crane market.

09/22/2026
Listicles
Five questions that show why planning a tower crane deployment is more complex than you might think
On spectacular construction sites, it's the structures that take the spotlight. But building bridges, tunnels or skyscrapers in the first place often demands equally extraordinary crane concepts. From the Sagrada Família in Barcelona to the Fehmarnbelt Tunnel in Denmark, Liebherr supports demanding tower crane deployments worldwide. Max Widder, Head of Project Planning at Tower Crane Solutions, gives insight into the challenges behind some of the most complex crane projects in the world.

09/10/2026
Press releases
Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung
A new residential development is under construction in Ho Chung, Sai Kung. Foundation and excavation and lateral support works have been underway since December 2024 and are expected to continue until end of 2026. Two Liebherr NC-B 12-70 tower cranes are handling material logistics on the confined site.