Mobile and crawler cranes

7 minutes - magazine 01 | 2025

Full speed ahead across the world’s oceans

Welcome on Board: In addition to a tour of the ship, a small Liebherr delegation had the opportunity to observe the loading of both crawler cranes in Bremerhaven in July last year.

Piece by piece: The LR 12500-1.0 and the LR 1700-1.0 were loaded onto the Sumire Leader as 211 individual packages. In the picture: a lattice boom section of the LR 12500-1.0.

Big barges for big cranes

Matthias Auch, Project manager at NYK Line

To California on a single tank of LNG

Whether in the crane industry or shipping: at NYK, we’re also future-proofing our range of services. By 2028, 20 ships in our fleet will be powered by LNG.

Matthias Auch, Project manager at NYK Line

A logistical powerhouse

From sea level to the mountains: The LR 1700-1.0 completed its first job in the province of Gangwon-do, east of Seoul. The crawler crane was used to erect wind turbines in this mountainous region.

LNG:

Sumire Leader

This may be of interest to you

Download

Product area mobile and crawler cranes

Our magazine