The new website is especially designed to inform about the Liebherr activities on the 2015 Intermat trade fair in Paris (France). On www.liebherr-intermat.com, Liebherr provides a wide range of information about the trade show of the construction industry, which takes place from April 20-25, 2015.
Visitors can find in depth information on the Liebherr exhibits from the fields of earthmoving and material handling equipment, special deep foundation machines as well as tower cranes, mobile and crawler cranes and concrete technology. Reports, images and videos supply visitors with information, impressions and useful advice on the Liebherr Intermat presentation. Furthermore, various brochures are available for download.
On the floorplan page, visitors can catch a glimpse of the Liebherr stand and of course, plan their way to the Liebherr booth in the open-air exhibition area, stand E6/E035.
The third but not last page of the Intermat website is dedicated to the media. Here, journalists can find Liebherr’s press information on occasion of the 2015 Intermat.
Direct link to the Intermat microsite: www.liebherr-intermat.com

10/09/2026
News
58 young professionals start their careers at Liebherr in Rostock
With the start of the new apprenticeship year, Liebherr-Rostock GmbH welcomes 58 new apprentices across eight different vocational training programs, including construction mechanics, mechatronics technicians, industrial clerks, and warehouse logistics specialists.

10/09/2026
News
Offshore Summit 2026 held in Rostock
The offshore industry faces a wide range of challenges and is undergoing constant change. At the Offshore Summit 2026 in Rostock, Germany, customers, partners and industry representatives came together to discuss current developments and look ahead to the solutions of tomorrow.

10/09/2026
Press releases
Considerate and flexible: two Liebherr NC-B cranes at work in Sai Kung
A new residential development is under construction in Ho Chung, Sai Kung. Foundation and excavation and lateral support works have been underway since December 2024 and are expected to continue until end of 2026. Two Liebherr NC-B 12-70 tower cranes are handling material logistics on the confined site.