Mobile and crawler cranes

Search

Search text

Start search

Results 1601-1610 of 1,850

Liebherr annual report 2024: Highlights

Liebherr-Transportation Systems is supplying 166 propane-based heating, ventilation and air conditioning (HVAC) units for Stadler’s new NT FLIRT NEX trains, also known as the Nordic Express.

https://www.liebherr.com/en-int/group/annual-reports/annual-report-2024/highlights-7352728

Crawler Dozers

The extra-long drive train matched with the optimum centre of gravity ensure outstanding grading characteristics.

https://www.liebherr.com/en-int/earthmoving/products/crawler-dozers-and-loaders/crawler-dozers/overview-5376647

The duty cycle crawler crane that changed Liebherr

And for logistics, it was important to have close access to trains and motorways. In Nenzing, Hans Liebherr found it all.

https://www.liebherr.com/en-int/group/magazine/hs-870/hs-870-3935583

Pioneering spirit at Liebherr – yesterday, today and tomorrow

Liebherr-Transportation Systems have been commissioned by SNCF from 2023 to 2030 to fit French trains in the Occitania region with the innovative air cycle air-conditioning systems.

https://www.liebherr.com/en-int/group/magazine/pioneering-spirit/pioneering-spirit-6586602

Chasing the cold

Liebherr also develops energy-efficient, ecological equipment for climate control on trains, metro systems and airplanes, and for reliable transportation of goods in a temperature-controlled environment

https://www.liebherr.com/en-int/group/magazine/chasing-the-cold/chasing-the-cold-3935581

The pump is the heart

Trained operators will always be needed. Their expertise in materials science and in assessing the status of the machine, the loading system and the components is essential.

https://www.liebherr.com/en-int/group/magazine/rosenbauer/rosenbauer-rls-3935487

Results per page