Group

Search

Search text

Results 261-270 of 404

Liebherr annual report 2022: Components

Moreover, the first mooring bearings were delivered for the self-alignment of floating offshore wind turbines.

https://www.liebherr.com/en-int/group/about-liebherr/annual-reports/annual-report-2022/product-segments/components-3935206

5 Facts about Liebherr’s expansion in Miami

5 Facts about Liebherr’s expansion in Miami

Equipped with an on-site classroom simulator, participants gain experience with modern control systems and scenarios for our LHM, ship and offshore cranes.

https://www.liebherr.com/en-int/n/5-facts-about-liebherr’s-expansion-in-miami-28059-3935641

Liebherr slewing bearings ensure self-alignment of floating wind turbines

Liebherr slewing bearings ensure self-alignment of floating wind turbines

This is a 16.6 MW twin floating offshore wind platform, consisting of two 8.3 MW wind turbines. Their V-shaped downwind rotors have a diameter of 180 metres each.

https://www.liebherr.com/en-int/n/liebherr-slewing-bearings-ensure-self-alignment-of-floating-wind-turbines-27255-3935641

Training | Liebherr deep foundation

In general, offshore training is not possible due to safety reasons. Manage machines, buy spare parts or check availability: MyLiebherr bundles all digital services in one place.

https://www.liebherr.com/en-int/deep-foundation/services/training-5389691

Liebherr cranes drive maritime research forward

Liebherr cranes drive maritime research forward

Research will focus on areas such as emission-free shipping, renewable offshore energy, sustainable aquaculture, and digital simulation of maritime processes.

https://www.liebherr.com/en-int/n/liebherr-cranes-drive-maritime-research-forward-211712-3935641

Liebherr annual report 2023: Components

Investment continued into the expansion of production in China, production facilities for hydraulic cylinders and the construction of a state-of-the-art test facility for validating main bearings for offshore

https://www.liebherr.com/en-int/group/annual-reports/annual-report-2023/product-segments/components-3935238

Solutions for wind energy

wind turbine components in the port, transporting them or even erecting wind turbines at sea, only the most powerful players from our maritime product range of ship cranes, mobile harbour cranes and offshore

https://www.liebherr.com/en-int/group/products/solutions/wind-energy/wind-energy-3935476

Results per page